Mobile
Log In Sign Up
Home > english-chinese > "初凝时间" in Chinese

Chinese translation for "初凝时间"

initial setting time
period of initial
presetting time
time of final setting
time of initial setting


Related Translations:
初进气口:  primary air inlet
初产:  primiparity◇初产妇[者] unipara; primipara
初冰期:  anaglacial
初凝:  initial set; pre-hardening◇初凝结 initial condensation; 初凝时间 [土] initial setting time
初治:  hatsujiinitial treatmentuejiuijiuji
初房:  initial chamberinitialchamberprococulumprotoconch
初虫:  primary zooid
初晶:  primary constituentprimary crystal
初禅:  pathama jhana
初彦:  hatsuhiko
Example Sentences:
1.Initial setting time
初凝时间
2.In the study , a new kind inorganic anchoring material was developed , which consisted of special binder and aggregate , the former is made from clinker , blast furnace slag and compound admixture , and the later is superfine sand . effects of the factors such as clinker / slag , binder / sand , solution / binder and constituent of solution on the strength , set - time and contraction of the matrix made from the anchoring material were studied
上述分析研究得出以下结论:新型无机锚固材料具有早强、快硬、高强特点, 10h .抗压强度可达26 . 5mpa , 365天强度可达144 . 0mpa ;初凝时间在40min . 3h .之间,且初终凝时间差在15分钟以内;在保湿条件下具有微膨胀性,膨胀率在0 . 5 %以内。
3.Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
文摘:水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
4.The cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
5.In order to study the direct relation between oil - base drilling fluid performance and cement job quality , a new developed evaluation method ( artificial core method ) was adopted ; the effects of the oil - base drilling fluid system and its main components on the shear cementing strengths of the first and second interfaces in cementing operation were investigated ; and those of the different mix slurry ratios on the gel strength , initial set time , final set time of slurry and the compressive strength of bond cement were examined too
摘要为了研究油基钻井液性能和固井质量之间的直接关系,采用新建立的评价方法人工岩心法,考察了油基钻井液体系及其主要组分对固井作业中第一、第二界面剪切胶结强度的影响规律,以及不同混浆比例下对水泥浆胶凝强度、初凝时间、终凝时间和水泥石抗压强度的影响规律。
Similar Words:
"初凝冰" Chinese translation, "初凝海冰" Chinese translation, "初凝结" Chinese translation, "初凝期" Chinese translation, "初凝区" Chinese translation, "初凝时期" Chinese translation, "初凝收缩" Chinese translation, "初浓度" Chinese translation, "初浓化" Chinese translation, "初排" Chinese translation