×

初凝时间 meaning in Chinese

initial setting time
period of initial
presetting time
time of final setting
time of initial setting

Examples

  1. Initial setting time
    初凝时间
  2. In the study , a new kind inorganic anchoring material was developed , which consisted of special binder and aggregate , the former is made from clinker , blast furnace slag and compound admixture , and the later is superfine sand . effects of the factors such as clinker / slag , binder / sand , solution / binder and constituent of solution on the strength , set - time and contraction of the matrix made from the anchoring material were studied
    上述分析研究得出以下结论:新型无机锚固材料具有早强、快硬、高强特点, 10h .抗压强度可达26 . 5mpa , 365天强度可达144 . 0mpa ;初凝时间在40min . 3h .之间,且初终凝时间差在15分钟以内;在保湿条件下具有微膨胀性,膨胀率在0 . 5 %以内。
  3. Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
    文摘:水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
  4. The cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
    水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
  5. In order to study the direct relation between oil - base drilling fluid performance and cement job quality , a new developed evaluation method ( artificial core method ) was adopted ; the effects of the oil - base drilling fluid system and its main components on the shear cementing strengths of the first and second interfaces in cementing operation were investigated ; and those of the different mix slurry ratios on the gel strength , initial set time , final set time of slurry and the compressive strength of bond cement were examined too
    摘要为了研究油基钻井液性能和固井质量之间的直接关系,采用新建立的评价方法人工岩心法,考察了油基钻井液体系及其主要组分对固井作业中第一、第二界面剪切胶结强度的影响规律,以及不同混浆比例下对水泥浆胶凝强度、初凝时间、终凝时间和水泥石抗压强度的影响规律。

Related Words

  1. 初进气口
  2. 初产
  3. 初冰期
  4. 初凝
  5. 初治
  6. 初房
  7. 初虫
  8. 初晶
  9. 初禅
  10. 初彦
  11. 初凝期
  12. 初凝区
  13. 初凝时期
  14. 初凝收缩
PC Version

Copyright © 2018 WordTech Co.