Chinese translation for "初凝"
|
- initial set; pre-hardening
◇初凝结 initial condensation; 初凝时间 [土] initial setting time
Related Translations:
初产: primiparity◇初产妇[者] unipara; primipara 初治: hatsujiinitial treatmentuejiuijiuji 初房: initial chamberinitialchamberprococulumprotoconch 初晶: primary constituentprimary crystal
- Example Sentences:
| 1. | Initial setting time 初凝时间 | | 2. | The cement - soil mixing pile with concrete core is a new soil improvement method , it means that , a concrete core is plugged into cement - soil mixing pile . concrete core pile and the cement - soil mixing pile undertake together vertical load . it appropriately combines the advantages of the precast concrete pile with the cement - soil mixing pile 水泥土组合桩是在水泥土搅拌桩成桩之后,水泥土初凝之前,用压桩机械将预制混凝土芯桩压入水泥土体内,待水泥土凝固后,芯桩与水泥土共同工作,承受上部荷载的一种新桩型。 | | 3. | In the study , a new kind inorganic anchoring material was developed , which consisted of special binder and aggregate , the former is made from clinker , blast furnace slag and compound admixture , and the later is superfine sand . effects of the factors such as clinker / slag , binder / sand , solution / binder and constituent of solution on the strength , set - time and contraction of the matrix made from the anchoring material were studied 上述分析研究得出以下结论:新型无机锚固材料具有早强、快硬、高强特点, 10h .抗压强度可达26 . 5mpa , 365天强度可达144 . 0mpa ;初凝时间在40min . 3h .之间,且初终凝时间差在15分钟以内;在保湿条件下具有微膨胀性,膨胀率在0 . 5 %以内。 | | 4. | Some conclusions are drawn : the compressive strength and flexural strength of cubic specimens of steel fibre reinforced concrete increase with the dosage of steel fibre ; without change of dosage of steel fibre , the elastic modulus of steel fibre reinforced concrete increases with the concrete age ; steel fibre reinforced concrete is of obvious function in cracking resistance , but there is no obvious function in avoidance of cracking ; for both common concrete and steel fibre reinforced concrete , the variation of the internal temperature is different from that of the external temperature before the initial set of concrete , and the internal strain of both two kinds of concrete is great , and , in general , the variation of strain of common concrete is much greater than that of the steel fibre reinforced concrete ; after the initial set of concrete , the variation of the internal temperature of both two kinds of concrete is similar to that of the external temperature , and the variation of the internal strain is relatively small 结果表明:钢纤维混凝土立方体的杭压强度、抗弯强度随着钢纤维掺量的增加而增大;在钢纤维掺量不变的情况下,钢纤维混凝土的抗压弹性模量会随着龄期的增加而提高;钢纤维对混凝土的阻裂作用很明显,而对混凝土起裂的限制作用不明显;在混凝土初凝之前,无论是普通混凝土还是钢纤维混凝土,内部温度的变化规律与外界温度的变化规律不同,并且此阶段混凝土内部应变的变幅很大,普通混凝土应变的变幅要比钢纤维混凝土应变的变幅大得多;在混凝土初凝之后,无论是普通混凝土还是钢纤维混凝土,内部温度的变化规律与外界温度的变化规律相同,并且此阶段混凝土内部应变的变幅很小。 | | 5. | Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement 文摘:水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。 | | 6. | The study results indicated that , arranged in the order of magnitude , the degrees of the effects on the cementing strengths of the two interfaces were the system , emulsion , main emulsifier , fluid loss control agent and white oil respectively ; the cementing strength would be doubled and redoubled after being cleaned by preflush , especially by the system , emulsion and fluid loss control agent ; and , along with the increase in the mix slurry ratio , the initial and final set times of slurry would be obviously lengthened and the compressive strength of bond cement would be remarkably reduced or the slurry wouldn ' t be even set 研究表明:对两界面胶结强度的影响由大到小依次是体系、乳状液、主乳化剂、降滤失剂、白油;前置液清洗后,胶结强度成倍提高,尤其对体系、乳状液和降滤失剂清洗效果最佳;随混浆比的增大,水泥浆初凝和终凝时间明显延长,水泥石抗压强度明显下降,甚至不凝。 | | 7. | The cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement 水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。 | | 8. | In order to study the direct relation between oil - base drilling fluid performance and cement job quality , a new developed evaluation method ( artificial core method ) was adopted ; the effects of the oil - base drilling fluid system and its main components on the shear cementing strengths of the first and second interfaces in cementing operation were investigated ; and those of the different mix slurry ratios on the gel strength , initial set time , final set time of slurry and the compressive strength of bond cement were examined too 摘要为了研究油基钻井液性能和固井质量之间的直接关系,采用新建立的评价方法人工岩心法,考察了油基钻井液体系及其主要组分对固井作业中第一、第二界面剪切胶结强度的影响规律,以及不同混浆比例下对水泥浆胶凝强度、初凝时间、终凝时间和水泥石抗压强度的影响规律。 |
- Similar Words:
- "初捻" Chinese translation, "初捻机" Chinese translation, "初捻纱" Chinese translation, "初酿威士忌" Chinese translation, "初鸟类" Chinese translation, "初凝冰" Chinese translation, "初凝海冰" Chinese translation, "初凝结" Chinese translation, "初凝期" Chinese translation, "初凝区" Chinese translation
|
|
|