| 1. | Can a software tester perform white - box testing on a specification 软件测试人员可以对《需求规格说明书》做白盒测试吗? |
| 2. | The software does something that the product specification doesn ' t mention 软件做了《产品需求规格说明书》中没提到的事情。 |
| 3. | The software does something that the product specification says it shouldn ' t do 软件做了《产品需求规格说明书》中规定不应该做的事情。 |
| 4. | The software doesn ' t do something that the product specification says it should do 软件没有做《产品需求规格说明书》中规定应该做的事情。 |
| 5. | What disadvantage is there to having a formal , locked - down specification 拥有一份正式的、确定下来的《需求规格说明书》会有那些不利的因素? |
| 6. | The software doesn ' t do something that the product specification doesn ' t mention but should 软件没有做《产品需求规格说明书》中没提到但应该做的事情。 |
| 7. | Assume that your product had a locked - down , final , absolutely - can ' t - change - it product spec 假设您的产品拥有一个固定下来的,最终的,绝对不能改变的《产品需求规格说明书》 。 |
| 8. | These two opposing forces result in conflict , and the result is a constantly changing product specification 这两股背道而驰的力量导致了冲突,最后结果就是《产品需求规格说明书》不断的变化。 |
| 9. | You will never be given a thoroughly detailed specification that perfectly meets the customer ' s needs and you will never have enough time to do all the testing you need to do 您永远也别想得到一份完全详细,并且符合客户需求的《需求规格说明书》 ;您永远也不会拥有足够的时间,来做完您必需做的测试。 |
| 10. | The buyer and the supervisor shall receive from the seller at least thirty ( 30 ) days notice in advance and seven ( 7 ) days definite notice in advance in writing or by fax confirmed in writing , of the time and place of the vessel ? s sea trial as described in the specifications ( hereinafter referred to as " the trial run " ) and the buyer and the supervisor shall promptly acknowledge receipt of such notice 卖方需分别至少提前三十( 30 )天和至少提前七( 7 )天向买方及其监造师发出船舶入海试航通知和精确试航通知书(以下称“试航通知” ) ,该试航通知应以书面形式或传真兼书面确认形式制作,其中应载明需求规格说明书中的试航时间和地点。 |