Mobile
Log In Sign Up
Home > english-chinese > "重庆轻轨" in Chinese

Chinese translation for "重庆轻轨"

chongqing metro

Related Translations:
武汉轻轨:  wuhan metro
今日重庆:  chongqing today
重庆晚报:  chong qing wan bao
重庆红旗:  hongqi
到重庆:  chongqing
重庆街:  chungking street
吴重庆:  chung-chieng wu
重庆交通:  transport in chongqing
魏重庆:  c. c. wei
Example Sentences:
1.This system has been applied in chongqing light rail project , and finally achieved a comparable better parctical effect
该系统在重庆轻轨中得到应用,并取得了较好的实际效果。
2.According to its own urban features , chongqing municipality has initially introduced the straddled - type monorail technology in the light rail construction and finished the first stage of line jiaoxin
重庆轻轨根据自身的城市特点,在全国率先引进跨座式单轨技术,建成了较新线一期工程。
3.This paper is based on the construction of jiangbei airport station of the chongqing no . 3 light railway , the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced
摘要以重庆轻轨三号线江北机场站为例,介绍了城市复杂环境条件下浅埋隧道、大基坑开挖控制爆破施工方法。
4.However , for realizing the goal of being open to traffic in 2004 , the light rail in chongqing municipality has initially adopted and successfully applied the management module of “ simultaneous construction of pier and beam ” in terms of project management which not only magnificently shortened the construction term but also guaranteed the construction quality
为实现2004年通车目标,重庆轻轨在项目管理上打破常规,开创并成功运用了“墩梁并举”的管理模式。既大幅缩短了工期,又确保了建设质量。
5.Daping tunnel in chongqing light - rail construction is located in downtown chongqing , where there has a dense population as well as numerous buildings . daping station tunnel enjoys a span in the clear of 19 . 8 meters , whereas its excavation span and area are 26 . 3 meters and 430 . 3 square meters respectively in the context of mere 4 - meter overburden and with a surrounding rock category of iii
重庆轻轨大坪车站隧道位于重庆主城区内,地面上人口密集,建筑物林立,大坪车站隧道净跨19 . 8米,开挖宽度26 . 3米,开挖断面430 . 3m ~ 2 ,覆盖层厚仅4米,围岩类别为类围岩。
6.A good many case of approaching excavation are studied in this article , such as the study of infection of be coal mining to the huayingshan tunnel , technology study of strucked tunnels of metro in shenzhen , countermeasure study of tunnel approaching pile foundation of metro in guangzhou , excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing , etc . on the basic of analysing and concluding relative study production all over the the world by the numbers , classification of approaching excavation , partition of approach zone , formula of partition of approaching zone , approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward . general methods studying and trea
本文结合作者多年来对华蓥山隧道减少压煤量研究、深圳地铁重叠隧道第11页西南交通大学博士研究主学位论文技术研究、广州地铁公纪区间广纺联段邻桩施工对策研究和重庆轻轨大坪大断面车站邻近基础浅埋暗挖工法优化分析等诸多近接施工问题案例的研究,在系统分析和归纳总结国内外相关研究成果的基础上,系统地提出了广义的地下工程近接施工的分类、分区、分区指标表达式、近接度与对策等级概念以及分区、分度准则,给出了研究和解决近接施工问题的普遍方法,如数值分析先行,模型试验、现场测试验证等。
7.Finally , after the essential factors that effect the ticket price of chongqing light rail transit are analyzed theoretically , this paper conclude that the optimal price level , which is between the marginal cost and the average cost , can be determined by ramsey pricing model and the idea of “ peak - load pricing ”
从理论上分析了影响重庆轻轨2号线票价的主要因素,提出了这个介于边际成本和盈亏平衡之间的最优票价水平可以由拉姆齐( ramsey )定价模型和“高峰负荷定价法”确定。
8.Furthermore , analysis of data from monitoring and surveying shows that it can serve as a guide to construction operation . in addition , the effect of surrounding rock ' s stability on such civil engineering project is succinctly analyzed . in a word , research results will undoubtedly benefit and guide later like projects
研究成果不仅成功应用在目前我国城市地铁隧道开挖跨度及断面最大、拱部结构最为扁平的重庆轻轨大坪车站隧道上,而且对以后特大跨超浅埋扁平隧道的施工具有非常重要的指导意义。
9.Being the director of the construction unit who is in charge of the rail and bridge project in the first stage as well as the project technology in the second stage , i have experienced the entire process ranging from technology introduction , technology acceptance to technology improvement
本人作为建设单位主管一期工程轨道梁桥项目和二期工程技术负责人,亲身经历了从技术引进、消化吸收到改进提高的全过程。本文根据几年来的管理实践,对重庆轻轨首创的“墩梁并举”工序管理方法进行了系统、全面的研究。
Similar Words:
"重庆模具产业园区概念规划动画脚本解说词" Chinese translation, "重庆某楼盘全程策划" Chinese translation, "重庆南开中学" Chinese translation, "重庆佩特" Chinese translation, "重庆啤酒股份有限公司" Chinese translation, "重庆轻轨袁家岗车站桥动力性能分析" Chinese translation, "重庆人" Chinese translation, "重庆赛格尔酒店" Chinese translation, "重庆三爱海陵股份有限公司" Chinese translation, "重庆三峡水利电力股份有限公司" Chinese translation