重庆轻轨 meaning in Chinese
chongqing metro
Examples
- This system has been applied in chongqing light rail project , and finally achieved a comparable better parctical effect
该系统在重庆轻轨中得到应用,并取得了较好的实际效果。 - According to its own urban features , chongqing municipality has initially introduced the straddled - type monorail technology in the light rail construction and finished the first stage of line jiaoxin
重庆轻轨根据自身的城市特点,在全国率先引进跨座式单轨技术,建成了较新线一期工程。 - This paper is based on the construction of jiangbei airport station of the chongqing no . 3 light railway , the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced
摘要以重庆轻轨三号线江北机场站为例,介绍了城市复杂环境条件下浅埋隧道、大基坑开挖控制爆破施工方法。 - However , for realizing the goal of being open to traffic in 2004 , the light rail in chongqing municipality has initially adopted and successfully applied the management module of “ simultaneous construction of pier and beam ” in terms of project management which not only magnificently shortened the construction term but also guaranteed the construction quality
为实现2004年通车目标,重庆轻轨在项目管理上打破常规,开创并成功运用了“墩梁并举”的管理模式。既大幅缩短了工期,又确保了建设质量。 - Daping tunnel in chongqing light - rail construction is located in downtown chongqing , where there has a dense population as well as numerous buildings . daping station tunnel enjoys a span in the clear of 19 . 8 meters , whereas its excavation span and area are 26 . 3 meters and 430 . 3 square meters respectively in the context of mere 4 - meter overburden and with a surrounding rock category of iii
重庆轻轨大坪车站隧道位于重庆主城区内,地面上人口密集,建筑物林立,大坪车站隧道净跨19 . 8米,开挖宽度26 . 3米,开挖断面430 . 3m ~ 2 ,覆盖层厚仅4米,围岩类别为类围岩。