Mobile
Log In Sign Up
Home > english-chinese > "连续施工" in Chinese

Chinese translation for "连续施工"

serial construction

Related Translations:
水利工程施工:  hydraulic engineering construction
施工队长:  spread superintendent
作业施工:  job execution
施工编号:  construction number
施工车辆:  construction vehicle
施工监测:  observation during and after construction
施工规程:  construction regulations
铺面施工:  pavement construction
施工技术:  co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
施工绞车:  builders winch
Example Sentences:
1.Continuous construction technology of full mechanized excavation in roadway turning of coal mine
煤矿综掘巷道拐弯连续施工技术
2.Construction technique of transforming simply - supported 70 m - span prestressed concrete box girders into continuous ones in hbocb
预应力混凝土箱梁简支变连续施工技术
3.1 powder , packed with woven bags plastic bags inside , normally 50kg per bag , also small packaging according to customers demand . 2 keep in dry ventilated places , and away from rain and moisture in transportation
1减水率为20 %或根据需要调整,用于有整体性要求连续施工的工程,如地下室框架屋面等高标号砼施工。
4.By the research on the raw materials , the mix proportion , the concrete temperature control in outlet , in transport and in placement , the cure and the post - cooling water , the synthetic measures for rcc dam construction in high temperature and the enforcement methods on basis of the computation and experience of jinghong hydropower station are presented in this paper
本文通过对原材料及配合比、混凝土出机口温度控制、运输过程温度控制、浇筑过程的温度控制以及混凝土浇筑后的养护和冷却通水等一系列研究,提出景洪电站高气温条件下大坝碾压混凝土连续施工的综合措施,并在计算和已有经验的基础上给出具体实施方法。
5.Based on above research results , mechanism of the mixture features is studied by some methods , such as chemical analysis , electron microscope and x - raying and so on to explain the characteristic principle . research conclusion confirms it is the high content of useful fly - ash composition and the high structure polymeric degree that lime fly - ash mixture not only can present possibility of delayed base compaction and strength regeneration compared with other base materials but also can take continuous construction process to compact base course and pavement
认为正是粉煤灰具有的高比例有效成分含量,以及结构上呈现的高度聚合的稳定性,使粉煤灰石灰混合料与其它常见的半刚性基层材料相比,不但能表现出显著的碾压成型的可延迟性、结构强度的可恢复性,而且还具有在一定条件下能够采用基层和沥青面层连续施工的独特性质。
6.In this paper we dissertate the common structure cross forms and excavating methods of highway double - arc tunnel home and abroad at the first part , and study common simulation methods of tunnel construction afterwards . based on the method of reversing and releasing the stress , and combined with the capacity of simulating continuous construction of ansys programme , we come up with the thought of using the method of applying virtual support force to release the stress step by step to realize the step - by - step release of initial stress during the tunnel construction simulation . with the help of design language of ansys , we develop a command to apply the virtual support force
探讨了应用平面应变模型进行隧道施工过程模拟的常用方法,在“反转应力释放法”的基础上,结合ansys软件可以模拟连续施工的特点,提出利用“施加虚拟支撑力逐步释放法”来实现隧道施工过程中地应力随工序的逐步释放的思路,并且利用ansys的apdl设计语言,开发出施加虚拟支撑力的命令,实现了施工过程中应力的逐步释放,从而找到了一种模拟隧道施工过程的好方法。
7.Based on the studies , it is proved that lime fly - ash mixture is provided with more time to compact during construction compared with other base materials in forming even higher structure strength but not in reducing strength within 1 ~ 3 days period of time . meanwhile , structure strength of the mixture which has been destroyed by some reasons can be recovered in a great extent if original structure is regained . on the other hand , during the high temperature summer season or under other conditions promoting the mixture to form strength , continuous construction process between lime fly - ash base course and bituminous pavement can be carried out to complete the building process in short time
确认二灰基层材料与其它类型的基层材料相比,在施工时具有较长的施工碾压成型时间,在一定时间里延迟成型的二灰基层强度不仅不降低,反而还有一定程度的提高;与此同时早期受到破坏的二灰材料在恢复整体性的条件下,结构强度能够在很大程度上得到再恢复;另一方面,在夏季高温季节以及在强化基层强度形成的前提下,二灰类基层和沥青面层可以采用连续施工的方式在较短的时间里完成路面铺筑工作。
8.Some construction specific characteristics for semerigid base course material of lime fly - ash mixture are studied systematically in this paper , which consists of possibility of delayed base compaction , strength regeneration and continuous construction between base course and pavement etc . through laboratory tests , rules of delayed base compaction , features of strength regeneration and primary conditions of continue construction are explored respectively
本文针对石灰粉煤灰类基层材料,全面系统地分析研究了该材料的施工特性,即施工碾压成型的可延迟性、早期强度的可恢复性以及基层和沥青面层施工的可行性等。通过系统的室内试验,了解和掌握了二灰类材料成型可延迟的规律、早期强度可恢复的特点和连续施工的基本条件。
9.According to the structural style and the characteristic of the continuous box - girder of xiamen dadeng bridge , the paper introduced detailedly how to construct the approach bridge contiunuously with the simply homemade moving scaffold construction thechnology under the condition of limited date and great project
摘要结合厦门大嶝桥连续箱梁的结构型式和工程特点,详细介绍了引桥现浇箱梁在工期紧、工程量大的特殊条件下,采用自制简便式移动支架连续施工的工艺过程。
Similar Words:
"连续升温干燥基准" Chinese translation, "连续升温时效" Chinese translation, "连续绳轮传动制" Chinese translation, "连续绳水诜机" Chinese translation, "连续绳制" Chinese translation, "连续施工法" Chinese translation, "连续施焊" Chinese translation, "连续施焊顺序" Chinese translation, "连续施行制动" Chinese translation, "连续十年" Chinese translation