Mobile
Log In Sign Up
Home > english-chinese > "沉降槽" in Chinese

Chinese translation for "沉降槽"

cylindrical settler
hydroseparator
sedimentation cell
sedimentation tank
settlerstorer
settling ark
settling tank
settling vat
settling vessel
spin bath
subsider
thickener


Related Translations:
放射性沉降:  radioactive depositradioactive fall outradioactive falloutradioactivefallout
沉降室沉降器:  settlingvessel
沉降分析:  analysis by sedimentationsedimentation analysissedimentation testsettlement analysis
沉降红细胞:  sedimented red cell
沉降天平:  sedimentation balance
沉降带:  geotectogenesu idencezonesubsidence zonesubsiding beltzone of subsidencezoneofsu idence
热力沉降:  thermal precipitation
沉降坑:  settling pit
沉降体积:  settling volume
再沉降:  redepositionreprecipitation
Example Sentences:
1.Development of new and high efficient sediment tanks and their applications
新型高效沉降槽的开发及其应用
2.Analysis of ground traverse settlement trough caused by shield construction
盾构施工引起的地表横向沉降槽分析
3.Analysis on the causes of the mudflow in the large - scale settler and countermeasures
大型沉降槽跑浑的原因分析及对策
4.Compared w ith t he c alculated r esults and monitoring data , to verify i f the p resent parameters can accord with the real situation of nanjing . the distribution of surface settlement trough is obtained by one - dimensional wave theory and calculation . the range of surface settlement trough coefficient is retrofitted
通过对比peck法计算值和实测值,验证现有的经验参数是否能很好地满足南京地区的实际情况,通过对实测曲线的拟合和数值计算得到沉降槽半宽度,从而改进了南京地区横向地表沉降槽宽度系数k的取值范围,有助于盾构法在南京地区的推广和应用。
5.In order to achieve the optimized tunneling approach , first , tunneling procedures , shift length , horizontal jet grouting length , bench length and space length between c and d part of crd method are optimized ; on the basis of these results , two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved . as results of the optimized scheme , the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure . the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data
为得出适合本段工程的最佳施工路线,利用大型有限元通用软件ansys对开挖顺序、开挖进尺、水平旋喷长度、台阶长度及crd工法施工的c 、 d部相错长度进行了有限元数值模拟和优化分析,并利用这些分析结果,进行了两个施工方案的三维有限元动态施工模拟,得出了较优的施工方案,并利用施工后的地表沉降槽曲线,对sk3 + 355断面处隧道上方的煤气管线的安全性进行了分析,得出了利用此施工方案施工不会造成此处煤气管线破坏的结论。
Similar Words:
"沉降板" Chinese translation, "沉降比" Chinese translation, "沉降滨线" Chinese translation, "沉降操作" Chinese translation, "沉降操作322" Chinese translation, "沉降槽;沉淀池" Chinese translation, "沉降槽池" Chinese translation, "沉降测定器" Chinese translation, "沉降测量" Chinese translation, "沉降测量仪;沉降仪" Chinese translation