沉降槽 meaning in Chinese
cylindrical settler
hydroseparator
sedimentation cell
sedimentation tank
settlerstorer
settling ark
settling tank
settling vat
settling vessel
spin bath
subsider
thickener
Examples
- Development of new and high efficient sediment tanks and their applications
新型高效沉降槽的开发及其应用 - Analysis of ground traverse settlement trough caused by shield construction
盾构施工引起的地表横向沉降槽分析 - Analysis on the causes of the mudflow in the large - scale settler and countermeasures
大型沉降槽跑浑的原因分析及对策 - Compared w ith t he c alculated r esults and monitoring data , to verify i f the p resent parameters can accord with the real situation of nanjing . the distribution of surface settlement trough is obtained by one - dimensional wave theory and calculation . the range of surface settlement trough coefficient is retrofitted
通过对比peck法计算值和实测值,验证现有的经验参数是否能很好地满足南京地区的实际情况,通过对实测曲线的拟合和数值计算得到沉降槽半宽度,从而改进了南京地区横向地表沉降槽宽度系数k的取值范围,有助于盾构法在南京地区的推广和应用。 - In order to achieve the optimized tunneling approach , first , tunneling procedures , shift length , horizontal jet grouting length , bench length and space length between c and d part of crd method are optimized ; on the basis of these results , two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved . as results of the optimized scheme , the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure . the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data
为得出适合本段工程的最佳施工路线,利用大型有限元通用软件ansys对开挖顺序、开挖进尺、水平旋喷长度、台阶长度及crd工法施工的c 、 d部相错长度进行了有限元数值模拟和优化分析,并利用这些分析结果,进行了两个施工方案的三维有限元动态施工模拟,得出了较优的施工方案,并利用施工后的地表沉降槽曲线,对sk3 + 355断面处隧道上方的煤气管线的安全性进行了分析,得出了利用此施工方案施工不会造成此处煤气管线破坏的结论。