Chinese translation for "整体吊装"
|
- be hoisted integrally
integral hoisting
Related Translations:
整体连接: integral connection 心理整体: psychological group 整体输出: global output gamma 整体效能: overall effectiveness 整体铸件: monoblock castingone piece castingone-piece castingsingle castingsolid casting 整体模: die, solidintegral moldintegral mouldnon-detachable moldnon-detachable mouldone-piece dieone-piece patternsingle patternsolid moldsolid mouldsolid patternunit moldunit mould
- Example Sentences:
| 1. | It is well known that the integral hoisting construction method is firstly applied in this bridge 广州解放大桥是其中之一,并首次采用整体吊装施工方法。 | | 2. | The work high above the ground can be reduced efficiently and the installing quality of support can be ensured through installing on ground and erecting entirely 充分利用制式器材在地面拼装,整体吊装,有效地减少了高空作业,保证了支架的安装精度和拼装质量。 | | 3. | These common methods include high altitude assemble construction in bulk , life - on segment by segment , integral life - on , integral hoisting , integral erect etc . some of these methods need a lot of falsework and others depend on devices for life - on or hoisting 网架的发展也要求施工方法不断更新和提高,以满足工程技术和经济的要求,从满搭脚手架铺设高空散装,到分片吊装、整体吊装、整体提升、整体顶升。 | | 4. | The common construction methods , technological characteristics and requirements are summarized , which includes high altitude construction in bulk , assemble , segment by segment , integral assembly , integral propping up , whole installation and sliding construction 论述了大跨度钢结构的一般施工方法、工艺特点及施工技术要点与难点,具体包括高空散装法、分条或分块安装法、整体提升法、整体顶升法、整体吊装法及滑移法。 | | 5. | Then , a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge . in addition , the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib . futhermore , the stabilization of arch rib in construction and service stage are analyzed detailedly 本文结合该大桥的施工实践,对无风撑钢管混凝土系杆拱桥的主要工艺施工流程进行了全面论述和总结,并重点对单片钢管拱肋两点整体吊装的结构受力进行了静力计算及对拱肋在施工和运营阶段的稳定进行了分析。 | | 6. | Referring to some type of the structure such as plane truss , grid truss and grid shell , the author dissertates the common construction technique including whole installation , integral propping up , integral lifting , high altitude construction in bulk , member assembly and sliding construction 结合大跨度钢结构的各种形式,如平面桁架、网架、网壳等,概要的论述了其一般的施工方法、工艺和技术要点,包括整体吊装法、整体顶升法、整体提升法、高空散装法、分单元吊装法和高空滑移法。 |
- Similar Words:
- "整体底座" Chinese translation, "整体点群过滤顺化" Chinese translation, "整体电动机" Chinese translation, "整体电加热" Chinese translation, "整体电压试验" Chinese translation, "整体调" Chinese translation, "整体调节机制" Chinese translation, "整体调整作用" Chinese translation, "整体调整作用综合控制作用" Chinese translation, "整体蝶" Chinese translation
|
|
|