整体吊装 meaning in Chinese
be hoisted integrally
integral hoisting
Examples
- It is well known that the integral hoisting construction method is firstly applied in this bridge
广州解放大桥是其中之一,并首次采用整体吊装施工方法。 - The work high above the ground can be reduced efficiently and the installing quality of support can be ensured through installing on ground and erecting entirely
充分利用制式器材在地面拼装,整体吊装,有效地减少了高空作业,保证了支架的安装精度和拼装质量。 - These common methods include high altitude assemble construction in bulk , life - on segment by segment , integral life - on , integral hoisting , integral erect etc . some of these methods need a lot of falsework and others depend on devices for life - on or hoisting
网架的发展也要求施工方法不断更新和提高,以满足工程技术和经济的要求,从满搭脚手架铺设高空散装,到分片吊装、整体吊装、整体提升、整体顶升。 - The common construction methods , technological characteristics and requirements are summarized , which includes high altitude construction in bulk , assemble , segment by segment , integral assembly , integral propping up , whole installation and sliding construction
论述了大跨度钢结构的一般施工方法、工艺特点及施工技术要点与难点,具体包括高空散装法、分条或分块安装法、整体提升法、整体顶升法、整体吊装法及滑移法。 - Then , a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge . in addition , the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib . futhermore , the stabilization of arch rib in construction and service stage are analyzed detailedly
本文结合该大桥的施工实践,对无风撑钢管混凝土系杆拱桥的主要工艺施工流程进行了全面论述和总结,并重点对单片钢管拱肋两点整体吊装的结构受力进行了静力计算及对拱肋在施工和运营阶段的稳定进行了分析。