| 1. | After passing inspection procedures for covert projects 合格后,办理隐蔽工程验收手续。 |
| 2. | Code of construction acceptance on wind power plant project 风力发电场项目建设工程验收规程 |
| 3. | The acceptance code for construction of small hydropower station 小型水电站建设工程验收规程 |
| 4. | Code for acceptance of local network communication lines engineering 本地网通信线路工程验收规范 |
| 5. | A study of sampling method for acceptance to freeway afforestation project 高速公路绿化工程验收中的抽样方法研究 |
| 6. | Specifications for engineering acceptance of hydropower station capital construction 水电站基本建设工程验收规程 |
| 7. | Code for acceptance of postal integrative computer network for wan engineering 邮政综合计算机网广域网工程验收规范 |
| 8. | Engineering receiving inspection 工程验收检查 |
| 9. | Specification of construction acceptance on water resources and hydroelectric development 水利水电建设工程验收规程 |
| 10. | Solar water heating systems - design , installation and engineering acceptance 太阳热水系统设计安装及工程验收技术规范 |