| 1. | Project delay or failure of uncompleted residential properties in china 中国境内住宅楼盘工程延误或未能完工的问题 |
| 2. | She ' s promised her client that he ' ll return to a finished home in ten weeks 事与愿违,一个又一个的问题令工程延误再延误,客人有可能需要暂以充气床褥栖身,等待工程完成。 |
| 3. | " the intention of the amended ordinance is to strengthen the control on road excavations and to miminise delays and inconveniences to the public 发言人说:修订条例旨在加强监管道路挖掘工程,并减少工程延误及对市民造成的不便。 |
| 4. | Forget the security worries , forget the reports of delayed works . greece is an awesome land and greeks are wonderfully welcoming people 忘记安全顾虑,忘记工程延误的报导。希腊事一片令人敬畏的土地,希腊人是了不起而友善的人民。 |
| 5. | This paper also gives systematical analysis to the types of project delay and the handling principles of claims of delay and cost 阐述了工期延误的类型,工程延误的处理原则,工期索赔的分析方法,费用索赔处理的基本原则和计算方法。 |
| 6. | Build - transfer - operate - private proponent finances and constructs facility on a turn - key basis assumes cost overrun , delay , specified performance risk -私营提议人在准备将其移交的基础上筹措资金并建造该设施(包括承担成本高出预算、工程延误及质量保证等风险) |
| 7. | " we regret that the school premises at sze mei street can not be made available for operation before the commencement of the school year and the inconvenience that may arise from the delay , " the spokesman stressed 发言人强调:由于该承建商表现不如理想引致工程延误,建筑署对于嘉诺撒小学未能于九月开课前完工所引致的不便,深表歉意。 |
| 8. | The contractor shall give notice to the engineer whenever the works are likely to be delayed or disrupted if any necessary drawing or instruction is not issued to the contractor within a particular time , which shall be reasonable 当因必要的图纸或指示不能在一合理的特定时间内颁发给承包商,从而可能引起工程延误或中断时,承包商应通知工程师。 |
| 9. | Our business - like approach to the job will help relieve worries about management supervision , cost over - runs , practical or governmental design requirements , and delay in work flow and management responsibilities 我们的业务处理方法:为客户分忧,协助客户管理监督整个过程和制作、整体的项目成本控制、实际的和当地政府的设计规范及要求、工程延误的差错预测和负责任的整体配套管理。 |
| 10. | The training works for the 4 . 6km upper river indus from the kcrc bridges in fu tei au to san wai barracks suffered significant slippage due to insufficient resources of the contractor and tdd re - entered the contract and re - tendered the remaining works in two stages , he said 6公里的上梧桐河,由于原有的承建商投放于工程合约的资源不足,引致工程延误,政府逼于收回合约,将剩馀工程分两期重新招标。 |