Hon fred li raised a question on railway alignment of scl 李华明议员就沙中线的铁路定线提出质询。
2.
Construct the cwb along the alignment of the existing airport railway in tunnel form is not feasible as no additional loading is allowed on this tunnel 沿现有机场铁路定线兴建中环湾仔绕道以隧道形式兴建并不可行,因为这条隧道不能承受额外的负荷。