| 1. | Construction of jinshao water diversion tunnel grouting 金哨引水隧洞灌浆施工 |
| 2. | Forecast and treatment of rock - burst in tunnel construction 永乐电站引水隧洞施工岩爆预测及防治 |
| 3. | Goal model on system reform of the urban public healthcare facilities in china 引水隧洞施工中遇不良地质段的处理措施 |
| 4. | Origin and treatment of water - diversion tunnel down fall at xiawenyang waterpower station 下温洋电站引水隧洞塌方的成因分析与处理 |
| 5. | Structural analysis for the liner and surrounding rocks of diversion tunnel in jinping waterpower station 锦屏二级水电站深埋引水隧洞衬砌及围岩结构分析 |
| 6. | But to deep - lying diversion runnel , there are a lot of problems to be resolved not only hi design theory but also in techniques 然而对深埋引水隧洞,无论是设计计算理论,还是施工建设技术,都处在探索阶段。 |
| 7. | Furthermore , total energy release of surrounding rockmass obtained by lerr can be used as optimal index for optimal design of excavation schemes 对太平驿水电站引水隧洞工程不同开挖步长下能量释放率指标的算例进行分析。 |
| 8. | For this reason , this paper puts forward a guide wall should be increased to reduce the sand flowing into the tunnel and increase sand - flushing effectiveness of sand gate 为此,提出了增设一道导墙的方案,以减少引水隧洞进沙并提高冲沙闸排沙效果。 |
| 9. | There are many main buildings in the plant such as concrete - faced rockfill darn , the second darn with clay core , spillway , diversion tunnel , surge tank , ground workshop and switch mom etc 电站的主要建筑物有砼面板堆石坝、粘土心墙二坝、溢洪道、引水隧洞、调压井、地面厂房和开关站等。 |
| 10. | Then the methods and the models are applied to the international project - - - - dd tunnel in zimbabwe , which testify the feasibility of the methods and models established above 接着将风险的可拓识别模型和可拓评判模型应用于国际工程项目? ?津巴布韦的dd引水隧洞,应用结果证明了所建模型的可行性。 |