| 1. | Scheduling to minimize the weighted sum of completion times 极小化加权完工时间和的调度问题 |
| 2. | Etc estimated time of completion 估计完工时间 |
| 3. | Scheduling a single continuous batch processing machine to minimize makespan 极小化最大完工时间的单机连续型批调度问题 |
| 4. | Monitoring model of space displacement field of concrete dam and its application 订单带多类工件时的极小完工时间之和问题 |
| 5. | Inverse scheduling problem on a single machine stochastic scheduling to minimize the total completion time 单台机器总完工时间随机排序问题的反问题 |
| 6. | Is overtime verified in an appropriate manner such as requesting client confirmation of completion 逾时工作是否需要核实,例如要求用户确定完工时间? |
| 7. | The problem of minimizing the total weighted completed time on single batch processing machine is studied 摘要讨论了单机分批排序问题中目标是极小化加权总完工时间的问题。 |
| 8. | A group of data of activity time parameters were gotten from execution of these models on computer 基于试算法,分别建立了在已知工作开工时间和工作完工时间的前提条件下,工作持续时间的计算模型。 |
| 9. | In 1978 , an algorithm for minimizing total weighted completion time with a series - parallel precedence was given by lawler 1978年lawler给出当任务间的优先约束关系为串并有向图时,加权总完工时间问题的算法。 |
| 10. | This paper presents suffcient conditions of the existence of optimal batch sequences when all jobs form one batch for some batching scheduling models 摘要研究了目标函数为完工时间平方和及最大延迟的分批排序问题存在仅分一批的最优解的充分条件。 |