By the turn of the century . the design of various flood control schemes for the river indus is progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002 多项梧桐河防洪计划的设计工作正在进行,预计完工日期可配合深圳河治理工程,目的是在二零零二年或之前,可减低发生水浸的危险。