English translation for "上坝"
|
- shangba
Related Translations:
- Example Sentences:
| 1. | Upper access tunnel collapse treatment for laxiwa hydropower station 拉西瓦水电站左岸高线上坝交通洞塌方处理 | | 2. | As well as the researches with digging up soft clay of the dam foundation after dewatering and reducing the water in the clay were taken in this paper 同时,本文对降水后坝基的软土开挖和上坝土料的减湿技术也进行了研究。 | | 3. | In shangba village of guangdong province , for instance , more than 250 people died of cancer from 1987 to 2005 ; while in huangmengying village of henan province , more than 114 people died of cancer between 1991 and 2005 从1987年至2005年,广东省上坝村有250多人死于癌症从1991年到2005年,河南省黄孟营村至少有114人死于癌症。 | | 4. | In shangba village of guangdong province , for instance , more than 250 people died of cancer from 1987 to 2005 ; while in huangmengying village of henan province , more than 114 people died of cancer between 1991 and 2005 从1987年至2005年,广东省上坝村有250多人死于癌症;从1991年到2005年,河南省黄孟营村至少有114人死于癌症。 | | 5. | Abstract : in the filling construction of lianhua concrete face rockfill dam , we have paid attention to plan the material sources according to the actual conditions , such as , using the excavated materials in other structures in order to reduce the cost , adopting the measures of filling by zones to quicken the construction progress and solve the construction problems during the cold seasons , using the convenient transportation roads to the dam and good road surface quality to ensure the high intensity filling , and selecting the rational construction equipment to make full use of the all equipment 文摘:莲花面板堆石坝填筑施工中,注意对筑坝料源做出符合工程实际情况的规划:利用其他建筑物的开挖料降低造价;采用分区填筑的措施,加快施工进度和解决寒冷季节施工问题;方便的上坝交通道路网和良好的路面,为高强度填筑提供有力保证;选择合理配套的施工设备使设备得到优化利用。 | | 6. | Sanyuan xijiao reservoir is a uniform earth dam which was constructed in the loess foundation with high water table , so the dam foundation dewatering is the main technique of the project , digging up soft clay of the dam foundation after dewatering and reducing the water in the clay which was filled in dam are also techniques of the project 三原西郊水库大坝是建造在高地下水位黄土地基上的均质土坝,坝基的降水问题是该工程存在的最大技术难题,同时对降水后坝基的软土开挖和上坝土料的减湿技术也是其关键技术之一。 | | 7. | To ensure the safety of the dam and provide the technology for the decision during the process of construction and store water . in this article , the elastic - plastic stress - deformation of dam is calculated and the consolidation is analyzed . including the rock - fill dam , the stress and deformation distribution of cut - off wall , the deformation of sloping core , the incresment and subduction of pore water pressure and the effective stress situation calculation 为确保大坝安全,并为大坝施工期和蓄水期运行决策提供必要的技术支持,本论文根据上坝土料的应力一应变一强度特性、渗透和固结等特性,对坝体进行了弹塑性应力变形计算和固结分析,包括大坝堆石体、防渗墙的应力及变形分布和斜心墙的变形、孔隙水压力增长及消散和有效应力状态计算等。 | | 8. | For high slab - faced rockfill dam , the old concept that any material can be put " on the dam should be discarded . the construction standard should not be decreased for the rockfill zone . the construction standards used for main rockfill zone and other zone should not too different to induce overly large rheological deformation 对于高面板堆石坝,从变形的长期性来看,应取消利用料区,改变任意料都可以上坝的陈旧观念;在坝体分区设计与施工填筑上,不应降低次堆石区的填筑标准,或者主堆石区与次堆石区的填筑标准不能相差太大,以免后期产生过大的流变变形或变形差。 |
- Similar Words:
- "上巴斯昆恰克" English translation, "上拔" English translation, "上拔井见" English translation, "上靶不良" English translation, "上把" English translation, "上白班" English translation, "上白岛" English translation, "上白米" English translation, "上白石" English translation, "上白土奈绪子" English translation
|
|
|