Chinese translation for "静荷载试验"
|
- static load test
Related Translations:
- Example Sentences:
| 1. | Timber structures - test methods - general principles for static load testing 木结构.试验方法.静荷载试验的一般原则 | | 2. | Test methods for static load test for combined tensile and transverse load resistance of panel wall systems in building construction 建筑物结构隔墙系统抗拉伸与横向荷载组合的静荷载试验方法 | | 3. | Standard methods of static load test for combined tensile and transverse load resistance of paneled wall systems in building construction 房屋构造中隔墙系统耐拉伸与横向结合荷载用静荷载试验的标准方法 | | 4. | Purpose of this paper is to test whether a prestress continuous box girder bridge qualifys for the safe property in wuhan city , then provides scientific data for the subsequent run 武汉市某立交桥工程修建完工,受当地城建委的委托,武汉理工大学土木工程与建筑学院将对该工程实施动、静荷载试验。 | | 5. | Load test is difficult to be carried with the development of higher bearing capacity and long length . as a new measuring technology , self - balanced method has its advantage on technology and economy . at present it is first load test method in north american and it has been applied in some province in china 作为一种新兴的单桩承载力测试技术? ?自平衡试桩法,其测试技术的优越性及其在经济上的巨大潜力,目前在北美已被公认为是进行基桩静荷载试验的首选方法,在我国的北京、江苏、甘肃的等地区也已经开始小范围地试用。 |
- Similar Words:
- "静荷载;不动荷载" Chinese translation, "静荷载;恒荷载;恒载量" Chinese translation, "静荷载;静负荷" Chinese translation, "静荷载极限试验方法" Chinese translation, "静荷载挠度" Chinese translation, "静荷重" Chinese translation, "静合触点" Chinese translation, "静合接点" Chinese translation, "静合接点 静合接点 后触点" Chinese translation, "静合接点, 释放接点, 后接点, 失磁接点" Chinese translation
|
|
|