| 1. | Cheung tsing tunnel to north west tsing yi interchange 长青隧道至青衣西北交汇处 |
| 2. | North west tsing yi interchange to san tin highway 青衣西北交汇处至新田公路 |
| 3. | North west tsing yi interchange to lantau toll plaza 青衣西北交汇处至青屿干线收费广场 |
| 4. | Tsing yi north coastal road and north west tsing yi interchange 青衣北岸公路及青衣西北交汇处 |
| 5. | Managing director : mr . paul a . simpson 青衣西北交汇处行政大楼 |
| 6. | Tsing yi north coastal road and north west tsing yi interchange before resuming their normal routeings 青衣北岸公路及青衣西北交汇处,然后返回原来路线。 |
| 7. | Gmb 308m will be rerouted to travel via tsing yi north coastal road and tsing yi north west interchange before resuming its normal routing 将会改经青衣北岸公路及青衣西北交汇处,然后返回原来路线。 |
| 8. | Owing to an unexpected incident , the airport - bound carriageways of cheung tsing tunnel near tsing yi northwest interchange are closed 由于长青隧道发生特别事故,现时长青隧道近青衣西北交汇处前往机场方向的行车线现时封闭。 |
| 9. | Tsing yi north coastal road was completed in 2002 . it provides a direct link between the northwest tsing yi interchange via tsing tsuen road with kwai chung 于二零零二年完成的青衣北岸公路,提供一条直接连接青衣西北交汇处经青荃路与葵涌连接的通道。 |
| 10. | Construction of a 2 . 2 km long dual 2 - lane carriageway between northwest tsing yi interchange and tam kon shan interchange linking tsing yi north bridge ; construction of an in - situ viaduct at tam kon shan and 3 nos 兴建一段介乎青衣西北交汇处与担杆山交汇处连接青衣北桥的2 . 2公里长的双程双线分隔行车道 |