Mobile
Log In Sign Up
Home > english-chinese > "雅砻江" in Chinese

Chinese translation for "雅砻江"

yalong jiang
yalong river


Related Translations:
:  Ⅰ名词(去掉稻壳的工具) rice hullerⅡ动词(用砻去掉稻壳) hull (rice with huller)
砻市:  longshi
基砻平面:  base plane
砻谷机:  rice huller;abrasive machine; hulling mill; paddy huller; hulling separator
砻谷机头:  rice hulling head
森下砻:  kurumi morishita
砻谷舂米:  hull grain and pound rice
鸦砻黄报春:  primula pratiiprimulapratii
龙砻笼隆:  long
砻谷胶辊:  rubber roller for hulling rice
Example Sentences:
1.Ertan hydropower station is the first power station built on yalong river
摘要二滩水电站是雅砻江梯级开发的第一个水电站。
2.The shaluli mountain chain constitutes a natural watershed between the jinsha river
沙鲁里山系是金沙江和雅砻江德天然分水岭。
3.The creep - slide - body of jinlongshan - section - ii locates the left bank of a reservoir which is situated the downstream of the yalongjiang river
位于雅砻江下游某水电站坝前左岸的金龙山区蠕滑体勘探资料详尽,监测资料全面、连续。
4.The jinping hydroelectric power station , located between from kala to the outlet of the yalong river , is designed as the first huge project of the river , which is rich in hydro logical energy
锦屏一级水电站是位于我国水能资源“富矿”之一的雅砻江卡拉?江口河段的“龙头”水库梯级电站,具有良好的补偿调节作用。
5.Based on the previous studies , the 2 - d laterally averaged temperature model for the temperature prediction of the huge and deep reservoir is developed in this paper . in the mean while , the movement mechanism of the turbulent buoyant flow in reservoir and the rule of the thermal stratification forming , developing and varying are probed . the model is then applied to the huge reservoir of xiluodu on jinshajiang river and the cascade power stations on yalongjiang river
本文在总结前人研究成果的基础上,探讨了水库湍浮力流的运动机理,以及温度分层的形成、发展和变化规律,建立了适用于大型深水库水温预测的立面二维水温模型,并应用于超大型水库? ?金沙江溪洛渡和雅砻江梯级电站各水库的水温预测,取得了一系列创新性研究成果。
6.The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully , with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres . the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment , and they have become a stratum of strong leakage . as a result , it has been an important problem for the dam foundation to stop leakage
锦屏一级电站位于西雅砻江的三滩至手爬沟河段,坝型为305米高双曲拱坝,正常蓄水位标高1880米。坝址区出露的地层为三叠系杂谷脑组二段大理岩和三叠系杂谷脑组三段的砂板岩。在勘探过程中,发现左岸坝肩大理岩体中的构造裂隙和溶蚀裂隙发育,且成为强渗透地层,为此坝基的防渗成为重要问题。
Similar Words:
"雅瑙阿卡湖" Chinese translation, "雅瑙尔" Chinese translation, "雅瑙库岛" Chinese translation, "雅瑙罗娃" Chinese translation, "雅楠" Chinese translation, "雅睿塔尔" Chinese translation, "雅畈" Chinese translation, "雅裨理" Chinese translation, "雅笃" Chinese translation, "雅翎鹑" Chinese translation