| 1. | Speed limit on cheung tsing highway slip road 长青公路支路车速限制 |
| 2. | Temporary traffic and transport arrangements on cheung tsing highway 长青公路临时交通及运输安排 |
| 3. | 15 cheung tsing highway 15长青公路 |
| 4. | Cheung tsing highway 长青公路 |
| 5. | The slip road from tsing yi road west to cheung tsing highway airport bound will be closed 连接青衣西路往长青公路机场方向的支路将会封闭。 |
| 6. | Notice is hereby given that to facilitate the road resurfacing works , the following temporary traffic and transport arrangements on 在长青公路机场方向实施以下的临时交通及运输安排: |
| 7. | B construction of a 1 . 5 km west tsing yi viaduct with hard shoulders connecting nam wan tunnel and existing cheung tsing highway B兴建一条约1 . 5公里长设有与行车线等宽硬路肩的高架道,将拟建的东青衣高架道连接至长青公路 |
| 8. | Motorists on cheung tsing highway heading for tsing yi road are advised to travel via tsing yi road west northbound , ching hong road eastbound and tsing yi road 沿长青公路往青衣路的驾车人士,须改经青衣西路北行、青康路东行及青衣路。 |
| 9. | Motorists on tsing yi bridge westbound heading for cheung tsing highway are advised to travel tsing yi road southbound , tsing yi road west northbound and cheung tsing highway 沿青衣大桥西行往长青公路的驾车人士,须改经青衣路南行、青衣西路北行及长青公路。 |
| 10. | Comprises a 7 . 6 km dual 3 - lane highway . the major elements of the project include : - a 1 . 5 km road connecting the western portal of nam wan tunnel with cheung tsing highway west tsing yi viaduct 一条1 . 5公里长的行车道,将南湾隧道西隧道入口连接近青衣西北交处的长青公路青衣西高架道 |