| 1. | Design of steel pipe pile project in sudan oilfield 苏丹油田钢管桩工程设计 |
| 2. | Techique of pumping concrete used in high pier construction 钢管桩和贝雷片支架在现浇箱梁施工中的应用 |
| 3. | Application of foundation pit support technology of steel - pipe pile with anchor 钢管桩附加锚杆基坑支护技术的应用 |
| 4. | Spiral - weld steel pipe pile 螺旋电焊钢管桩 |
| 5. | Open end pipe pile 开底钢管桩 |
| 6. | The application of the bolt static steel tube pile in the treatment of high - rise buildings ' pile accidents 锚杆静压钢管桩在高层建筑桩基事故处理中的应用 |
| 7. | According to the special atmospheric and geologic conditions in sudan oilfield , steel pipe pile is the preferred basement of oilfield equipment basement 摘要根据苏丹油田的气候和地质条件,选定其油田设备基础为钢管桩基础。 |
| 8. | The authors suggested porous plate at the pit bottom , together with slope anchorage net and steel pipe piles to strengthen the foundation 本文提出了采用粉喷桩多孔板暗撑加固抗隆起技术,与边坡喷锚网、钢管桩联合支护结构相结合。 |
| 9. | Determining and improving the bearing capacity of steel tubular piles for piled wharfs has long been an issue that the engineering field has endeavored to study and solve 摘要确定和提高高桩码头钢管桩的承载力是工程界一直致力于研究的问题。 |
| 10. | The main technique measures for the design and construction of steel pipe pile are confirmed based on the calculation of vertical and horizontal bearing capacity 通过计算钢管桩的垂直承载力和水平承载力,确定了钢管桩工程设计施工的主要技术措施。 |