Mobile
Log In Sign Up
Home > english-chinese > "钢筋工程" in Chinese

Chinese translation for "钢筋工程"

reinforcing work

Related Translations:
弯曲钢筋:  bent barbent up barmoment reinforcement
钢筋应力:  reinforcement stre esreinforcement stresses
钢筋切断:  bar cuttingcutting of bars
钢筋砼:  reinforced concrete
收缩钢筋:  shrinkage bar
双向钢筋:  two way reinforcedtwo way reinforcementtwo-way concrete slabtwo-way reinforcement
方钢筋:  square barsquare steel bar
钢筋夹:  bar clamp
短钢筋:  bar dowel
支撑钢筋:  bearing barbearingbar
Example Sentences:
1.For achieving automation statistics of reinforcing steel bar , this paper has study automation construct and express in model of steel information taking the frame girder as investigative object
为了实现钢筋工程量的自动统计,文章以“平法”框架柱为研究对象,对施工图钢筋统计系统进行了研究。
2.For achieving automation statistics of reinforcing steel bar , this paper has study automation construct and express in model of steel information taking the frame girder as investigative object . the most work is as follow
为了实现钢筋工程量的自动统计,本文以“平法”框架柱为研究对象,对钢筋信息的自动提取和表达模型进行了研究。
3.In the mean time , i discusses the technology of drill - grouting pile foundation , especially in the technology of drilling works , steel works and concrete works , etc . at last , i put forward the methods in dealing with the common accidents
同时,本文详细探讨了岩溶地区钻孔灌注桩施工技术,特别是对其成孔工艺、钢筋工程、混凝土工程等进行了重点分析,并提出了针对其常见质量事故的处理方法。
4.In chapter 5 , several operation processes of engineering budget are discussed , and then the work flow model and software architecture of engineering budget are presented . in chapter 6 , the examples of the two subsystems are finally given
第五章,论述了工程预算各阶段的操作流程,在此基础上建立了工程预算系统的工作流程模型,并给出了工程预算系统的总体结构以及钢筋工程量提取和预算编制两个子系统的组成。
5.Owing to reinforcing steel bar is expressed to adopt indirect method in " plane method " construction drawing , whole information of reinforcing steel bar can be confirmed according to the label information and combining criterion construction drawing while statistics engineering quantity
由于在“平法”施工图中采用间接的方法表达钢筋,因此统计钢筋工程量时必须根据平面中的标注信息并结合标准构造详图才能确定钢筋的完整信息。
6.Owing to reinforcing steel bar is expressed by adopting indirect method in " plane method " construction drawing , whole information of reinforcing steel bar can be confirmed according to the label information and combining criterion construction drawing while statistics engineering quantity
由于在“平法“施工图中采用间接的方法表示钢筋,因此统计钢筋工程量时必须根据平面图中的标注信息并结合标准构造详图才能确定钢筋的完整信息。
7.In chapter 3 , the steel reinforcement character semantics in construction drawing is firstly analyzed , and then the method of steel reinforcement quantity extraction based on character semantics is presented , which recognize and calculate the steel reinforcement quantity with character semantics of label and autoeciousness
第三章,分析了工程施工图纸中包含的信息,归纳出施工图中钢筋的特征语义,提出了基于钢筋特征语义的钢筋识别和工程量计算方法,利用钢筋的标注和寄生特征语义来识别并计算出钢筋工程量。
8.Firstly this text studied the super thick planceer of mass concrete of high - rise building with ten characteristics comparing with the common reinforced concrete , according to the above characteristic from three aspect including the reinforcing bar project , the concretes project and the form project , elaborate the construction characteristics of super thick mass concrete planceer of high - rise building , have a detailed explanation of the big reinforcing bar link technique and the pump technique of the prepared concrete
首先本文研究了高层建筑超厚底板大体积混凝土的与普通钢筋混凝土相比具有的十个特性,根据上述特性从钢筋工程、模板工程、混凝土工程三个方面阐述了高层建筑超厚底板大体积混凝土的施工特点,重点就钢筋连接技术、预拌混凝土泵送技术进行详细论述。
9.Fabrication of the box beam is divided into such parts as reinforcement , formwork , concreting , prestressing , moving and storing of beam , pipe grouting under pressure , end sealing of the beam , water - proof layer on the bridge surface system , protective coating etc . the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects , such technologies as : manufacturing and fixing of reinforcement , steel reinforcement fixing baseplate , web plate and top plate respectively and lifting the steel skeleton into form , requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork , optimization of concrete ratio , concrete pouring process of two ends of beam in priority over the middle , in sequence of first baseplate followed by web plate and top plate at last , concrete pouring in inclined section and in horizontal layer , concrete vibration mainly by external vibrator in assistance with internal vibrator , methods and regulation for steam curing of concrete , dual controls over stress and strain to ensure quality of prestressing workmanship , construction method of effective beam moving by heavy - weight special moving facility , some regulations and key notes about construction of grouting under pressure , beam ends sealing , water - proof layer on the bridge surface system , protective coating
箱梁制造由钢筋工程、模板工程、混凝土工程、预应力工程、移存梁工程、孔道压浆工程、梁体封端工程、桥面防水层和保护层工程等施工环节组成。文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
10.The next this text is based on the appearance theories , according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency , suppose the level shears are line with the displacement , adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model , from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint , and analysis the crack rule and the influence factor of mass concrete temperature contract , and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length , at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience , bringing five technique measures to prevent the temperature crack of mass concrete
其次本文以唯象理论为基础,根据高层建筑超厚底板大体积混凝土承受的温差主要是均匀温差和均匀收缩的特点,阐述了大体积混凝土温度应力理论计算的简化方法和最大整浇长度的计算方法,同时根据大体积混凝土温度收缩应力基本公式和大体积混凝土结构施工经验,提出了防止大体积混凝土温度裂缝的五项技术措施。最后本文以厦门邮电大厦3 . 5m超厚底板施工为实例,从大体积混凝土温度应力计算、混凝土保温材料厚度计算、混凝土配合比的确定,钢筋工程、模板工程、混凝土的泵送和浇筑以及大体积混凝土内部温度的监测和后期养护等方面进行了理论应用。
Similar Words:
"钢筋钢" Chinese translation, "钢筋钢丝" Chinese translation, "钢筋隔块" Chinese translation, "钢筋工" Chinese translation, "钢筋工场" Chinese translation, "钢筋工作" Chinese translation, "钢筋构架" Chinese translation, "钢筋箍" Chinese translation, "钢筋骨构架焊接机" Chinese translation, "钢筋骨架" Chinese translation