Mobile
Log In Sign Up
Home > english-chinese > "造陆" in Chinese

Chinese translation for "造陆"

[ zàolù ]
epeirogenetic; epeirogenic
◇造陆运动 [地] epeirogeny; epeirogenetic movement; epeirogenic movement; epeirogenesis; 造陆作用 epeirogenesis; epeirogeny


Related Translations:
陆标:  [航空] landmark◇陆标定位 landmark fix
陆亮:  liang lu
陆婷:  lu ting
陆界:  continental spheregeospherelithosphere
椿陆:  tsubakiriku
陆门:  land gatemutsukado
陆浩:  lu hao
前陆:  foothillsforelandfrontland
陆斡:  luwo
陆生:  terrestrial-limnal facies
Example Sentences:
1.This process probably contributes substantially to the differential movement which accompanies epeirogenic rejuvenation .
这一过程可能在基本上提供了与造陆回春伴生的差异运动。
2.Basin floors generated at different times will exhibit a hierarchical sequence of crustal structure and epeirogenic behaviour .
不同时期生成的盆地底板,将显示地壳构造的等级次序和造陆性质。
3.Correct treatment of plate thermal epeirogeny shows the previous wholly-vertical contraction/expansion requirement to be erroneous .
对板块热力造陆作用的正确分析表明,先前那种认为收缩膨胀作用完全是垂直方向上进行的看法是错误的。
4.One is to continue reclaiming land from the sea
其中一个办法就是继续填海造陆
5.The continuous economic development and ecological environmentevolution in the delta area are restricted by the trend and speed of land building of the delta
三角洲造陆的趋势及速度制约着三角洲经济的持续发展和生态环境的演变。
6.His creativity , experience , and vision will be invaluable as the chamber builds upon its work as greater bostons leading business and civic organization . ? br
19世纪末完成后湾造陆工程,邻近郊区和城镇又相继划入,城区范围成倍扩大。
7.Through analyzing the requirement of sea reclamation project , this paper expatiates about the application of vacuum preloading drainage consolidation method in large - scale sea reclamation project
摘要从填海造陆工程的要求出发,阐述真空预压排水固结法在大型填海造陆工程中的应用。
8.The outcomes show that not only the channel near the outlet has been extended , but also the created land area increased to varying degrees during the tests of a regulated discharge regime of the river and ; a regulated discharge regime has significant roles on keeping the balance of erosion and deposition of the estuary
结果表明:调水调沙期间,河口口门附近不管是河道延伸,还是造陆面积都有不同程度的增加;调水调沙对河口的冲淤平衡有重大的作用。
9.A statistical model is developed and indicates high correlation between the accretion of modem yellow river delta and the water and sediment discharge of yellow river , and the model shows the necessary water and sediment discharge per year to ensure the equilibrium of alluvion and erosion of yellow river delta
黄河三角洲净造陆面积与黄河入海水沙量的统计模型说明,黄河三角洲冲淤动态平衡时的黄河入海径流量为71 . 93亿m ~ 3 a ,输沙量为1 . 853亿t a 。
10.Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status , on special income water and sediment conditions , boundary conditions and oceanic power conditions , this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar , each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate , affect the sediment deposition factors , primary factors are tide prop , the gate widens gradually , estuary gate have branches , brine induced flocculation . this paper study the estuary gate widen , estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data , for the first time , deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception , build the relationship between the estuary income sediment with deposition land area , draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons , the delta coastline may on the dynamic balance status . ( 6 ) this subject firstly brings up estuary sediment optimized control conception , and has the primary study on the macroscopically optimized control conception method
研究认为: ( 1 )黄河河口口门迳流潮汐区域并非持续保持淤积状态,在特定的来水来沙、边界条件和海洋动力条件下,该区域可以处于冲刷状态; ( 2 )从河口泥沙沉积分配的过程来看:三角洲与滨海区泥沙的沉积变化趋势是基本一致的,各部位的泥沙沉积比例变化基本呈波动状态,且三角洲与滨海区泥沙的沉积比例与来沙量密切相关,基本成正比关系; ( 3 )在口门处,影响泥沙沉淤的因素主要集中在潮汐顶托、口门逐渐加宽、河口门分汊、盐水造成絮凝等,本报告主要对口门加宽,口门西妥理工大学工程硕士专业学位论文分汉对河道淤积的影响进行了定量分析: (一扣根据实测资料首次建立了河赎流路泥沙沉积分配的回归计算式,据此可以预估计算河口不同区域泥沙的沉淤量; 、 5 )本项研究首次论证了河口三角洲岸线动态平衡的概念,并建立了黄河河口来沙量与造陆面积的相关关系,得出了当河口多年平均来沙量维持在3 . 45亿t时其河口三角洲岸线则可能处于动态平衡状态的重要结论; ‘ 6 )本项研究首次提出了河口泥沙优化调控的概念,并对其宏观优化调控模式进行了初步探讨。
Similar Words:
"造林者" Chinese translation, "造淋巴细胞组织增生" Chinese translation, "造淋巴组织细胞增生病毒" Chinese translation, "造淋巴组织细胞增生簿" Chinese translation, "造流机" Chinese translation, "造陆不整合" Chinese translation, "造陆沉积" Chinese translation, "造陆沉积作用" Chinese translation, "造陆的" Chinese translation, "造陆地垒" Chinese translation