| 1. | Prepare the bom ( bill of material ) and define the cabling diagram 整理出物料清单并对电气连接图进行说明。 |
| 2. | Method also updates the connections map of connections to database names 方法也更新到数据库名称的连接的连接图。 |
| 3. | Which looks up the string name for a connection from the connections map ,它从连接图中查询字符串名称找到连接。 |
| 4. | Refer to the appropriate field connection drawing in the manual for all wiring information 需要了解所有线路信息,请参阅手册中相应的连接图。 |
| 5. | Preparation of documents used in electrotechnology - part 3 : connection diagrams , tables and lists 电子技术用文件的制定.第3部分:连接图表和目录 |
| 6. | Preparation of documents used in electrotechnology ; part 3 : connection diagrams , tables and lists 电工技术使用的文件的制订.第3部分:连接图,图表和一览表 |
| 7. | Electricity meters , tariff time switches and ripple control receivers ; connection diagrams , terminal marking , circuit diagrams 电度表.计价定时转换开关和波纹控制接收机.连接图.端 |
| 8. | Control , measurement and automation for industrial processes . symbolic representation . part 4 : additional detailed symbols for instrument interconnection diagrams 工业过程的控制测量和自动化.符号表示法.第4部分:仪表互连接图的详细补充符号 |
| 9. | Based on low power consumption mcu msp430f , the paper introduces the method of designing the human - computer interaction interface module , and presents the hardwire circuit and the pivotal steps of using state - analysis to design human - computer interface 摘要介绍了基于超低功耗单片机msp430f的人机交互接口模块的设计方法,给出了硬件连接图及状态分析法设计人机接口的几个关键步骤。 |
| 10. | At network layer , an initialization algorithm based polling is researched to establish preliminary connections autonomously . and a genetic algorithm based optimization is used to obtain a routing tree that results in minimum energy consumption 在网络层的初始化算法中,研究了基于轮询的方法来形成网络的最初连接图,并用基于优化的遗传算法来获得一棵具有最小能量消耗的路由树。 |