驳线: joint stitchingover-lapping stitchoverlapping a few stitchingoverlapping stitchingoverlappingafewstitchingoverlock &blind-stitchstartoverstitch overla ingstitch overlappingstitchoverlappin
Example Sentences:
1.
11 transport of dredged materials ( not used as filling materials for the projects ) shall be by water tight trucks / vessels to the marine barging points or designated marine disposal grounds 应使用有防水设备保护的货车/船舶把挖掘出的物料(工程项目未有用作填料者)运往海上载驳点或指定的海上卸泥场。