| 1. | Prepare quality plan and inspection sheet for new project or design change 制定新产品或设计更改的产品的质量控制计划。 |
| 2. | Quality control planning 质量控制计划 |
| 3. | Act as a leader on quality control plan compiling depending upon team work ( engineering and process staff ) 质量控制计划中,在团队中能够胜任领导的角色。 |
| 4. | Pre - control the component quality at the suppliers ’ side , implement the inspection according to quality control plan and specification 对供应商进行与控制,根据质量控制计划及零部件标准实施检验。 |
| 5. | Standard guide for establishing a measurement system quality control program for analytical chemistry laboratories within the nuclear industry 制定核工业分析化学实验室用测量系统质量控制计划的标准指南 |
| 6. | Define & update assigned module qc plan to ensure the quality of responsible products is controlled in an effectiveness & efficiency way 制定和更新指定模块的质量控制计划,以最为有效、有效率的方式确保产品的质量。 |
| 7. | Define & amp; update assigned module qc plan to ensure the quality of responsible products is controlled in an effectiveness & amp; efficiency way 制定和更新指定模块的质量控制计划,以最为有效、有效率的方式确保产品的质量。 |
| 8. | Define & amp; amp; update assigned module qc plan to ensure the quality of responsible products is controlled in an effectiveness & amp; amp; efficiency way 制定和更新指定模块的质量控制计划,以最为有效、有效率的方式确保产品的质量。 |
| 9. | Prepare all the quality specification for their own project , quality control plan , inspection and test and all other documentation necessary for each project 为各个的项目准备质量规范,质量控制计划,检验及测试计划及其它所有与此项目有关的文件 |
| 10. | Develop and set up product qualification test plans and quality plan , learn structure , parameter and function of new design , research more applications of the tools 开发和制定新产品测试计划及质量控制计划,了解新品设计结构、参数及功能,研究产品的使用特性。 |