Chinese translation for "负载试验"
|
- on-load test
Related Translations:
稳压负载: voltage regulation load 计算负载: assumed loadcalculated load 轴负载: axle loadaxle weight 变负载: changing loadvarying duty 电容负载: antiinductive loadcapacitance loadingcapacitive loadcondensive loadload, capacitive 总负载: aggregate loadoverall loadtotal loadingtotal offered load
- Example Sentences:
| 1. | Soil ; testing procedures and testing equipment - plate load test 土壤.试验程序和试验设备.板极负载试验 | | 2. | Oeration duty test 动作负载试验 | | 3. | Locomotive load test is a very important link of railway department repairing locomotive 机车负载试验是铁路机务部门检修机车很重要的环节。 | | 4. | Presented are the functions , main technical parameters and constituent components of the ac drive test system for locomotive , composed of locomotive power supply , converter , 3 - axial bogie rolling load test bench , asynchronous traction motor test bench and microprocessor automatic control system 摘要介绍了集机车供电、变流器、三轴转向架滚动负载试验台、异步牵引电动机试验台、微机自动控制于一体的机车交流传动试验系统的功能、主要技术参数以及主要设备。 | | 5. | Energy consume , electric strength , insulation resistance , ground conductivity , leakage current , microwave leakage , power input , normal temperature , humidity treatment , glow wire , horizontal flame , vertical flame , tracking , ball pressure , rainproof , water splash , dustproof , salt fog , endurance , motor load test , cord flexing , cord pulling , pull & torque test , lamp replacement , construction check etc 能耗、电气强度、绝缘电阻、接地连续性、泄漏电流、微波泄漏、功率、温升、湿热试验、灼热丝、水平燃烧、垂直燃烧、漏电起痕、球压试验、防雨淋、防溅水、粉尘、盐雾、耐久性(寿命)试验、电机负载试验、电源线弯折、电源线提拉、拉扭力测试、灯头互换性、安全结构检查等。 | | 6. | Firstly , the experimental phase current and input power data obtained from load test are employed to estimate the parameters in ii rated condition . then , the phase current and input power data in locked rotor condition are used to track the variation of the parameters of the secondary coil with slip frequency . the classical method and the direct modification method are also used to estimate the parameters of the induction machine in comparison with this technique 首先利用了负载试验的定子电流和输入功率数据来识别额定工况下的电机参数,然后又使用了堵转时的定子电流、输入功率数据来识别电机二次绕组参数随转差频率的变化,并与传统参数测试方法和直接修正参数法进行了比较。 |
- Similar Words:
- "负载时电压调整变压器" Chinese translation, "负载时电压调整装置" Chinese translation, "负载时电压相位调整器" Chinese translation, "负载时分接头转换变压器" Chinese translation, "负载时间" Chinese translation, "负载试验(短路试验)" Chinese translation, "负载寿命" Chinese translation, "负载速度" Chinese translation, "负载速度满载航速" Chinese translation, "负载损耗" Chinese translation
|
|
|