| 1. | Design of surge chamber in mianhuatan hydropower station 棉花滩水电站调压室设计 |
| 2. | Specifications for design of surge chamber of hydropowerstations 水电站调压室设计规范 |
| 3. | Surge chamber 3 - d nonlinearly finite element analysis by ansys 的调压室三维非线性仿真分析 |
| 4. | Operation of air cushion surge chamber at ziyili hydropower station 自一里电站气垫式调压室的运行 |
| 5. | Combined goaf gas drainage technology with pressure adjusted control room 采用调压室联合抽放采空区瓦斯技术 |
| 6. | Construction techniques for steel enclosed air cushion surge chamber at jinkang hydropower station 金康水电站钢包气垫式调压室施工技术研究 |
| 7. | Calculation of water diversion system for air cushion surge chamber and conventional surge chamber 气垫调压室与常规调压室双室引水系统的计算 |
| 8. | Bodily form optimum for bottom branch pipe in tail water surge chamber of goupitai hydropower station 构皮滩水电站尾水调压室底部岔管体型优化 |
| 9. | Optimization design of tailrace surge chamber concrete lining layers for dachaoshan hydropower station 大朝山水电站尾水调压室混凝土衬砌分层优化设计 |