| 1. | Figure 7 shows the sequence for tape bonding the chip and assembling the package . 图7所示为带状引线连接芯片和管壳装配的工艺程序。 |
| 2. | Factory is the most common word for the buildings where products are manufactured or assembled . Factory最为普通,指产品生产或装配的工厂。 |
| 3. | Preassembled parallel wire strands, in contrast to structural strands, do not require prestretching . 预先装配的平行钢丝索与结构钢缆相比,不需要预拉。 |
| 4. | American designers and contractors have expertise and experience with cable assemblies in bridge structures . 美国设计者和承包商们具有在桥梁结构中使用钢索装配的专长和经验。 |
| 5. | The 8080, 6800, z-80, and 8085 systems were presented to illustrate the simplicity of cpu assembly . 本章之所以介绍8080,6800,Z-80,和8085系统,目的在于说明CPU装配的简易性。 |
| 6. | The realization of gear - box virtual assembly base on vrml 的减速箱虚拟装配的实现 |
| 7. | Standard practice for installation of barbed tape 有倒刺绝缘带装配的标准操作规程 |
| 8. | Variation analysis for multi - flexible autobody assembly 车体多柔性件装配的误差分析 |
| 9. | Many of these options are field assembly only 这些选配件中的许多种都只能在现场装配的。 |
| 10. | Touching joint oriented to virtual manufacture and assembly 面向虚拟制造和装配的触感接口 |