| 1. | Brief on the automation of railway marshalling station 铁路编组站自动化概述 |
| 2. | Automation of railway yard 铁路编组站自动化 |
| 3. | Application of tw - 2 hump automation system in zhuzhoubei marshalling yard 2驼峰自动化系统在株洲北编组站改造中的应用 |
| 4. | The occurrence of angular wagon flow in fengtai west marshalling station and solution 丰台西编组站折角车流分析与处理 |
| 5. | Discussing on the capacity - enlarging modification plan in xiangfan north marshalling station 襄樊北编组站扩能改造方案探讨 |
| 6. | Study on influence of trains ' speed increasing on the operations of marshalling station 列车提速对编组站运营工作的影响研究 |
| 7. | Scheduling model and algorithm of using up - and - down lines on railway marshalling station 铁路编组站到发线运用的排序模型和算法 |
| 8. | Computation of capacity at marshalling yard based on imbalanced transport circumstances 基于不均衡运输的编组站能力计算方法探讨 |
| 9. | Study on intelligent generating method of work plan in marshalling station based on multi - agent 的编组站作业计划智能化编制方法研究 |
| 10. | The reverse reception crossing analysis of the classification train in one - way marshalling yard 单向编组站改编列车反接进路交叉分析 |