| 1. | Construction monitring for steel tube concrete arch bridge 钢管混凝土系杆拱桥施工监测 |
| 2. | Study on non - plank construction method of tied 系杆拱桥无支架施工方法研究 |
| 3. | Dynamical load test of a concrete filled steel tubular arch bridge 钢管混凝土系杆拱桥动荷载试验 |
| 4. | Dynamical load test of a concrete - filled steel tubular arch bridge 钢管混凝土系杆拱桥动荷载试验 |
| 5. | Lateral buckling load of tied - arch bridges with transverse braces 有横撑系杆拱桥的侧向稳定承载力 |
| 6. | Study on effective prestressing forces under anchorage of tied - arch bridge 系杆拱桥系杆锚下有效索力研究 |
| 7. | Fem analysis of the temperature stress in cfst tied arch bridge 钢管混凝土系杆拱桥温度应力的数值模拟分析 |
| 8. | Asymmetric construction of steel pipe concrete arch rib tied arch bridge 钢管混凝土拱肋系杆拱桥不对称施工 |
| 9. | The supervisory of 202 m - span concrete filled steel tubular tied arch bridge 跨径钢管混凝土系杆拱桥的施工控制 |
| 10. | Numerical simulation of fastening board support system of concrete structure 大跨钢管混凝土系杆拱桥更换系杆施工 |