| 1. | The settlement of the reasonable coal - pillar width in the short - wall mining 短壁开采合理煤柱宽度的确定 |
| 2. | Analysis of economy and technology to shortwall face and shortwall miner 短壁工作面和短壁采煤机的经济技术分析 |
| 3. | The effect of coal pillar ' s sizes on the ground subsidence in short - wall mining 短壁开采中煤柱尺寸对地表沉陷的影响 |
| 4. | Viscoelasticity analysis and application of key strata of covering rock to short wall mining 短壁开采覆岩关键层黏弹性分析与应用 |
| 5. | Development and application of fully mechanized mining and top - coal caving equipment in shortwall face in china 我国短壁工作面综采综放设备的发展和应用 |
| 6. | Practice and experience of driving gob - side entry in shortwall top - coal caving mining with light supports during residual mining 短壁残采轻放工作面沿空掘巷的实践与认识 |
| 7. | Regularity and characteristics of ground pressure when rapid advancing implemented in short - wall fully - mechanized top coal caving face 短壁综放面快速推进矿山压力显现规律与特征 |