Mobile
Log In Sign Up
Home > english-chinese > "生产能力计划" in Chinese

Chinese translation for "生产能力计划"

production capacity planning

Related Translations:
生产能力:  productive power; production capacity; efficiency; fertility; throughput◇生产能力过剩 over-capacity; excess capacity; 生产能力利用率 capacity utilization rate; 生产能力指数 index of production capacity
生产能力过剩:  excess capacityexcess production capacityover capacityovercapacity
额定生产能力:  capacity ratingnominal capacityrated capacity
机组生产能力:  capacity of unit
发酵生产能力:  fermenter productivity
工业生产能力:  industrial capacityindustrial production capacityindustrial production index
生产能力调节器:  capacity regulator
极限生产能力:  limiting capacity
总生产能力:  gross productivitytotal productive capacity
设备生产能力:  capacity of the plantequipment capacity
Example Sentences:
1.B . 1 . 6 is a capacity planning method in use
采用了生产能力计划方法吗?
2.Modeling line capacity planning for pwb assembly systems and its approximate solution algorithms
装配线综合生产能力计划模型及其近似求解算法
3.Responsibility of factory capacity planning . come out feasible action plan to support loading
负责工厂生产能力计划,提供可行性方案,以确保足够生产能力
4.Finally , a new decision - making method would be proposed to ensure that the operation manager of the firm could make a correct decision on whether the factory ’ s capacity should be changed as well as its volume . consequently the uncertainty of the long range capacity planning in semiconductor manufacturing could be controlled effectively . then the high level uncertainty analysis of long range capacity planning ? factory ’ s space resource planning was discussed in detail
本文首先对半导体长期生产能力计划过程中的不确定性进行了研究:定义生产能力计划过程中的关键不确定性因素;量化这些关键不确定因素对生产能力的影响;在此基础上,提出一种新的决策方法,保证工厂运营管理者正确做出是否改变以及改变多少生产能力的决策,从而达到有效地控制半导体长期生产能力计划过程中不确定因素的目的。
5.The uncertainty of these variables causes the variability of factory ’ s capacity planning , especially for long range capacity planning in semiconductor manufacturing because of its shortening product life cycle , high equipment cost , etc . the uncertainty issue of long range capacity planning process in semiconductor manufacturing was studied in this thesis
这些变量在实际中的不确定性,导致了工厂生产能力计划的变动性。由于半导体产品生命周期日益缩短,生产设备造价昂贵等原因,工厂长期生产能力需求的不确定性在半导体制造业表现得更为突出。
6.Based on the historical space forecast data and corresponding actual data provided by a global semiconductor assembly and test company , the uncertainty of space planning was defined . during this analysis process , linear regression , grey prediction , neural network back propagation algorithm and confidence interval were applied , respectively , to define the uncertainty . compared with those methods , the confidence interval of historical space forecast error , calculated by mathematical statistics , was the reasonable method to define the space forecasting uncertainty
本文从半导体工厂长期生产能力计划的顶层即厂房生产面积的计划展开,对一跨国半导体封装测试公司提供的厂房生产面积的长期历史预测数据以及对应的真实数据进行分析,采用线性回归,灰预测,神经网络bp算法,基于数理统计的置信区间的求解等方法分别定义厂房生产面积预测的不确定度,经多种方法的比较得出,基于数理统计方法求解出的生产面积历史预测误差置信区间能直观清楚地标定不确定度。
Similar Words:
"生产能力负荷" Chinese translation, "生产能力概念" Chinese translation, "生产能力过剩" Chinese translation, "生产能力和提高的可能性" Chinese translation, "生产能力极限" Chinese translation, "生产能力计划工作" Chinese translation, "生产能力计划和操作顺" Chinese translation, "生产能力计划和操作顺序系统" Chinese translation, "生产能力建成率" Chinese translation, "生产能力控制" Chinese translation