Mobile
Log In Sign Up
Home > english-chinese > "牵索" in Chinese

Chinese translation for "牵索"

guy rope; guy line; guy; stay

Related Translations:
牵抖:  pulling and shaking
牵杆:  draw headtie bar
牵链:  guy chain
牵索绞车:  guy winch
牵曳绞车:  warping winch
部分牵伸:  partial draft
牵条螺栓:  distance sink bolttie bolt
钢轨牵板:  tie plate
烟囱牵条:  funnel guy
牵出力矩:  pullout torquee
Example Sentences:
1.Personal protective equipment against falls from a height - lanyards
防高处坠落用个人防护设备.牵索
2.Guy cleats for ships
船舶用牵索系绳栓
3.Guyed steel stack
牵索铁烟囱
4.Vang guy winch
吊杆牵索绞车
5.Aerospace series . elements of electrical and optical connection . test methods . part 414 : unmating of lanyard release connectors
航空航天系列.电气及光学连接元件.试验方法.第414部分:牵索释放连接器的非配合
6.Personal protective equipment for work positioning and prevention of falls from a height - belts for work positioning and restraint and work positioning lanyards
工作定位和防止从高处坠落的个人防护设备.工作定位和限动用固定带及工作定位用牵索
7.Secondly , the construction techniques of cantilever concreting method of girder are analyzed in details . the construction program of stay rope formwork traveler , including the selection of formwork traveler type and the design of formwork traveler , is introduced
本文重点分析了主梁的悬灌施工技术,从挂篮方案的比选与定型,到挂篮的设计与使用都做了详细的介绍,本桥采用牵索式挂篮施工方案。
8.In this paper , the construction techniques of linjiangmen cable - stayed bridge in jilin , such as large sinking well technique of pier , climbing form panel technique of main tower , stay rope formwork traveler technique of girder and construction control , are summarized in details
本文全面总结了吉林临江门斜拉桥施工技术,详细叙述了主墩大型沉井施工技术,主塔爬模施工技术,主梁牵索式挂篮施工新技术。斜拉索施工及施工控制等。
9.According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler , increasing amount of cable tension during casting concrete was computed , and under every key operating condition of casting concrete , traveler ' s frontend elevations were educed . we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method , which assured that the bridge ' s construction went on successfully . and then , it was discussed how to simulate the effect of prestressing force in spatial analysis
根据挂篮前端牵索锚固点处的变形协调条件建立了挂篮上混凝土浇筑过程中牵索索力的增加量,并推导了挂篮上混凝土浇筑过程中的各主要工况下挂篮前端标高的计算公式,对文晖大桥挂篮上混凝土浇筑过程中的牵索索力和挂篮前端标高进行了细致地控制,确保了混凝土浇筑的顺利进行,为整个主梁线形和索力的双控打下了良好的基础。
10.Further more , with the reference of testing information , the paper analyzed the traveler construction technique , obtained the guy rope stress and the front - end bottom mark of traveler for each step . using fem theory and large general - purpose program ansys , the paper discussed the cable - stayed bridge space stress characteristic and the relationship between several main design parameters
以此为基础,参照试验资料,详细分析了斜拉桥施工中挂篮的施工工艺,及其各个状态下的受力情况,得出在各个阶段挂篮牵索的索力值及挂篮前端各个工况的主梁底立模标高。
Similar Words:
"牵丝攀藤" Chinese translation, "牵损重机" Chinese translation, "牵缩弓" Chinese translation, "牵缩肌" Chinese translation, "牵缩纤维" Chinese translation, "牵索,控索" Chinese translation, "牵索,支杆,拉索" Chinese translation, "牵索铲斗挖掘机" Chinese translation, "牵索船" Chinese translation, "牵索吊运车式龙门起重机" Chinese translation