Mobile
Log In Sign Up
Home > english-chinese > "激发因素" in Chinese

Chinese translation for "激发因素"

motivating factor

Related Translations:
激发整流器:  exciting rectifier
弧激发:  arc excitation
魔力激发:  vitalize
荧光激发:  fluorescence excitation
激发脉冲:  excitation pulse
激发想象:  to finish college
个别激发:  discrete excitation
激发指数:  excitation index
预激发:  preexciting
波激发器:  wave-exciting device
Example Sentences:
1.In some instances , these ideas or constructs were also causes for action - that is , they were motivators or drivers
在某些情况下,这些思想或构想也引起行动换句话说,他们是激发因素或驱动程序。
2.Specific triggers , such as sun exposure or stress , can send the virus traveling through nerve pathways to mucosal sites of activity in the genitalia , mouth and even eyes
特异性激发因素,如日晒或压力,能够使病毒穿越神经通路到达生殖器、口甚至眼睛的粘膜活跃部位。
3.The primary factor of soil erosion is the erosion of yanshan period granite , the secondary factor is heavy rainfall , and the inducing factor is human activity
水土流失产生的主导因素是燕山期花岗岩分布的丘陵区岩体结构遭到破坏;从属因素是持续强烈的降雨,从而加剧了水土流失;激发因素是人类工程活动对地质环境的破坏。
4.By surveying the sample plot , the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation , terrain , were studied . by using the method of quantitative t heory i , the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed , and the mathematical models relate d were developed . the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged . the main terrain factors of the mountain slope that affect the program stability are according to their importance , slope , position and dir ection . the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25
通过典型标准样地调查资料,探讨了造林爆破整地工程的坡地稳定性与降水、地形等因子的相互关系,应用数量化理论,对在有充分降水条件下的低山丘陵区的爆破整地工程损失程度与地形因子之间的关系进行了系统分析,并建立了相应的数学模型,研究指出,充分的前期降水和日最大降雨量是引起爆破整地工程损失的激发因素;影响爆破整地工程稳定性的主要地形因子是地面坡度,其次为坡位、坡向,实施爆破整地工程的地面坡度以不超过25为宜。
Similar Words:
"激发性欲药" Chinese translation, "激发学生的求知欲" Chinese translation, "激发眼曾用名“刺激眼”" Chinese translation, "激发药包" Chinese translation, "激发移动" Chinese translation, "激发因子" Chinese translation, "激发因子,激发因素" Chinese translation, "激发引信" Chinese translation, "激发萤光物质" Chinese translation, "激发荧光" Chinese translation