Mobile
Log In Sign Up
Home > english-chinese > "淹没射流" in Chinese

Chinese translation for "淹没射流"

submerged jet

Related Translations:
淹没:  submerge; flood; inundate; drown; submergence; sinking; drowned; submersion 短语和例子被淹没的地区 inundated area; 洪水淹没了整个地区。 the flood inundated the whole district. 雨水淹没了庄稼。 heavy rainfalls flooded
淹没流:  submerged flow
淹没效应:  swamping effect
淹没范围:  range of inundation
淹没面积:  inundated area
物淹没:  drown
淹没大陆架:  submerged shelf
全淹没:  total flooding
淹没的:  coversdrownedsubmergiblesubmersesubmersiblewetted
局部淹没:  partial submergence
Example Sentences:
1.The flow characteristics , eddy structure and energy dissipated mechanism of multi - horizontal submerged jets ( mhsj ) are studied by means of 3 - d numerical simulation
摘要采用三维数值模拟,研究了多股多层水平淹没射流的流动特性、漩涡结构和消能机理。
2.The results show that an eddy surrounding the main stream of the multiple jets exists and forms several strong shear flows and enhances the effect of energy dissipation
研究结果表明:多股多层淹没射流利用在射流轴线周围所形成的强剪切、三维立体漩滚的剧烈混掺来实现消能,消能率较高,且在平面上没有形成明显的、贯穿的立轴漩涡。
3.Based on the 3 - d numerical simulation and the model test , many factors affecting the flow pattern stability and the hydraulic characteristics of the horizontal submerged jets are studied
摘要采用数值模拟和模型试验相结合的方法,分析了水股分层、坎高、出口体型和跌坎形式等因素对多股水平淹没射流的流态稳定性和水力特性的影响。
4.The results show that multi - lever and multi - strand horizontal submerged jets are a new energy dissipation type and have better stability of flow patter , lower velocity in the slab and higher dissipated energy rate than the single - lever and the multi - strand horizontal submerged jets
研究表明,多股多层水平淹没射流较单层多股水平淹没射流流态稳定性好、临底流速低、消能率高,是一种高效的新型消能方式。
5.Cfx software is used to simulate flow fields of water cushion pool . contour stream line , vortex and kinetic energy in water cushion pool are found and offered as visualization form . the results of numerical simulation and piv are analyzed and compared in this paper
使用数值软件( cfx )对此水工实验模型的淹没射流流场进行了数值模拟,得到水垫塘内的速度场、等流函数线图,将这些计算结果以可视化结果的形式给出。
6.Abstract : through study on energy dissipation of goupitang project on the wu - jiang river , the velocity field in the water cushion pool downstream ski - jump or drop was measured by hot - film anemometers on a fine model with scale 1 380
文摘:结合乌江构皮滩水利枢纽工程消能问题研究,用热膜流速仪在比尺为1 380的精细模型上量测了拱坝挑跌流在水垫塘内的流速场,并由试验成果分析了淹没射流在水垫塘内的消能过程,计算了消能率。
7.According to the selected project , a stability test with scale of 1 : 35 of cushion bottom had been done . with the research results of the experiments and the flow shape of xiao wan hydraulic power station were thought about , on the other hand , the ternary complex jet shape of baishan water cushion was analyzed , all this gave a base for the analysis of the force of the cushion bottom . through observation , the dynamic water pressure , the fluctuation pressure , the time - homogeneous pressure on the surface of the bottom and the characteristics of the fluctuation pressure could be got , also the calculation method and the test results were compared to get the argument
针对选定的方案,进一步做了1 : 35比尺的水垫塘底板稳定性试验;通过试验及借鉴小湾水垫塘内水流流态的研究成果,分析白山水垫塘内三元复杂淹没射流流态,为水垫塘内底板受力分析打下基础;通过观测得到水垫塘底板动水冲击压力、脉动压力、底板上下表面的时均压力及脉动压力特性,并通过计算方法与试验成果进行相互比较论证。
Similar Words:
"淹没区" Chinese translation, "淹没润滑" Chinese translation, "淹没三角洲" Chinese translation, "淹没森林" Chinese translation, "淹没沙洲" Chinese translation, "淹没深度" Chinese translation, "淹没时间" Chinese translation, "淹没式" Chinese translation, "淹没式出水口" Chinese translation, "淹没式等离子体枪" Chinese translation