Mobile
Log In Sign Up
Home > english-chinese > "河坝" in Chinese

Chinese translation for "河坝"

[ hébà ]
river dike
river wall


Related Translations:
栏河坝:  barrage
河坝场:  hebachang
河坝传说:  riverbank legends
截河坝:  jieheba
栏河坝发电厂:  barrage power stationbarragepowerstation
奥德河坝:  ord riber dam
萨菲德河坝:  safid rud dam
卡佩勒河坝:  qu'appelle river dam
沃尔夫河坝:  wolf cr. dam
Example Sentences:
1.Changheba spirit is the time spirit of longnan people
河坝精神是陇南人的时代精神。
2.This involves continued efforts to relocate the few remaining polluting factories away from its banks while preserving the historically important sites
包括继续努力重新部署少数持续污染的工厂以远离河坝,保护重要历史古迹。
3.Salmon that manage to evade the commercial fishing fleets , hungry bears , dams , and fishermen swim to their birthplaces and spawn before dying
为了回到它的出生地产卵,大马哈鱼必须从渔船、饥饿的熊、河坝以及渔网的重重围捕下逃生。
4.At last , the rotor - bearing system of a franics hydraulic generator set of the 3rd machine in the nanya river yaoheba factory is used as an example , calculating result and discussion are given by integrating matlab compute and simulation language
最后以南桠河姚河坝水电厂3f水轮发电机组为例,结合matlab仿真计算语言,给出了计算结果并进行了讨论。
5.The dislocation interfaces of early stage were controlled by the slide of the ne fold . the dominant dislocation interfaces , in the dam area , is the one of the second stage , which resulted from the slide of the lava layer and lagerkluftes from nw to se because of the affect of the majiaheba faultage ' s thrusting overriding to the dam area from nw to se . the dislocation interfaces of the third stage were the result of the overprint of the structure of ne to the one of nw
早期阶段形成的错动带受控于北东向纵弯褶皱的层间弯滑机制;第二阶段形成的错动带在坝区占主导地位,它们是由于北东向马家河坝断层由北西向南东的滑脱逆冲推覆影响坝区,并造成坝区向南东缓倾的岩层沿原生构造面向南东滑动的结果;第三阶段形成的错动带则是由于北西向构造叠加于早期北东向构造之上而致。
6.Accessing the data , the knowledge , the model and the relative parameter from database , knowledge - base , model - base and the interface , the expert system automatically infers and calculates the maximum depth and length of stilling basin the bantai hydraulic project and the xiangyanghe dam have been given as the example
以班台闸和向阳河坝为工程实例,根据数据库、知识库、模型库中的相关数据、知识经验、模型,以及人机交互界面的相关参数,进行分析推理计算,求出最大消力池深和池长,对系统的相关功能模块进行的验证。
7.Through the all - sided tectonic analyses , it can be deduced that there are two aspects will be the hidden defects to the dam and the engineering stability of the reservoir area . one is the dislocation interfaces resulting from the the majiaheba faultage ' s thrusting overriding and other causes of formation . the second is the region of strong deformation , such as the above of the dam , middle and high positions of the lava layers and the regions of overprint of the structure of ne to the one of nw , which should be taken into account especially
通过区域和坝区错动带的全面构造解析,认为由马家河坝断层逆冲推覆作用而在坝区形成的向金沙江下游缓倾的错动带以及其它成因的错动带是坝区和库区工程稳定的隐患,尤其是变形较强的坝址区上游区、中高层位以及北西向构造期的错动带叠加于北东向构造期错动带的部位,更应该引起足够的重视。
8.In this paper according to the design scheme of yao heba power station in nan yahe river , the mathematical model with longer and complicated conduit system , elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built , which include conduit system , surge tank , draft tube , water turbine , generator and governor . the hydraulic losses are taken into account , and nonlinearization in water turbine and the governor is also taken into account
本文根据南桠河姚河坝水电站的设计方案,对水轮机调节系统,按长引水管道复杂引水系统、弹性水击、调速器为pid调节规律,在小波动情况下,对包括引水道、调压井、尾水管、水轮机、发电机、调速器在内的水轮机调节系统建立数学模型,并计及引水管道水力摩阻损失,对水轮机、调速器考虑了其中的非线性,利用功能强大的matlab软件编制了源程序进行计算机仿真计算。
Similar Words:
"河岸泽兰" Chinese translation, "河岸沼泽地" Chinese translation, "河岸整坡" Chinese translation, "河岸整治" Chinese translation, "河八王" Chinese translation, "河坝场" Chinese translation, "河坝传说" Chinese translation, "河伴" Chinese translation, "河蚌" Chinese translation, "河蚌目" Chinese translation