| 1. | Distribution automation in city proper of leshan shawan 乐山沙湾城区的配电自动化 |
| 2. | Search operation in pak sha wan correctional institution 白沙湾惩教所搜查行动 |
| 3. | Central wellington street - pok fu lam sandy bay 中环(威灵顿街) -薄扶林(沙湾) |
| 4. | Start and finished point : pak sha pier , sai kung 起点及终点西贡白沙湾码头 |
| 5. | Tidal prism of sansha bay and its water exchange with the open sea 三沙湾纳潮量及湾内外的水交换 |
| 6. | Maxi cab green 10a central wellington street - pok fu lam sandy bay 10a中环(威灵顿街) -薄扶林(沙湾) |
| 7. | One of the famous beaches at oahu 白沙湾海滩:冲浪胜地。 |
| 8. | Cascade hydropower station regulation by monitoring system at shawawn 沙湾梯调监控系统对电站的控制过程 |
| 9. | Pak sha wan correctional institution 白沙湾惩教所 |
| 10. | The project site is located on the western shore of pak sha wan , sai kung 工程项目的地点位于西贡白沙湾的西岸。 |