| 1. | Figure 3 - immersed tube tunnel option - above seabed 图3 -沉管隧道方案在海床之上 |
| 2. | Dry dock at shek o for casting for tunnel unit 铸造隧道沉管的石澳乾船坞 |
| 3. | Dry dock at shek o for casting of tunnel unit 铸造隧道沉管的石澳乾船坞 |
| 4. | Problems needing attention in survey of immersed tunnel 沉管隧道测量中值得注意的几个问题 |
| 5. | Positing of a precast tunnel unit 放置预先铸成的其中一段隧道沉管 |
| 6. | Effect of keeping core soil on stability of tunnel working face 沉管干振挤密抗拔防浮碎石桩抗拔试验研究 |
| 7. | Diving casting cast - in - place pile 深基础沉管灌注桩 |
| 8. | Calculation methods for settlements of immersed tunnels induced by tidal load 潮汐荷载引起沉管隧道沉降计算方法 |
| 9. | Analysis and treatment of quality accident of ramming - expanded sunk pipe pile 沉管夯扩桩工程质量事故分析与处理 |
| 10. | Immersed tube tunnel options 沉管隧道方案 |