Mobile
Log In Sign Up
Home > english-chinese > "水电部" in Chinese

Chinese translation for "水电部"

mew

Related Translations:
电气水电部:  ge hydro
Example Sentences:
1.How do the hydropower troops implement their project cost management
水电部队如何实施项目成本管理
2.The repair and preservation work of the turbine blades is the international problem for all the hydro power plant
对水轮机转轮叶片的维护与维修是各国水电部门的一项重要工作,每年都要在其上耗费大量的人力、物力、财力。
3.He calls on local authorities to search for new water sources in rural areas and power departments to distribute electricity supplies in a rational manner
他要求地方领导要在乡村地区寻找新的水源,水电部门要合理安排电量的供应。
4.This research is one part of a great scientific research project , which is supported by national ministry of water resources and electric power of china , the people ' s government of heilongjiang province and the water conservancy department of heilongjiang province
在冻害防治技术方面,具有重要的理论价值和现实指导意义。本研究是根据水电部、黑龙江省人民政府、黑龙江省水利厅批准的重大科研项目立题研究的。
5.The repair and maintenance work of the turbine blades is the international problem for all the hydro power plant . a lot of manpower and resources is costed every year , especially in china , because the rivers contain plentiful sand , the problem is more serious
水轮机转轮叶片的维修与维护一直是各国水电部门的一项重要工作,每年都要对其耗费巨大的人力、物力、财力,尤其是我国河流泥沙含量大,此项工作就更为艰巨。
6.Since the founding of the armed police hydropower troops in 1966 , tens of large hydropower projects including some national key projects with high technical content and greater construction difficulties are undertaken by the troops ; with which the technical features of the troops are created based on the engineering practice and the continuous advancement of the construction techniques
摘要武警水电部队自1966年组建以来,承担了数十座技术含量较高、施工难度较大的大型水电项目和其他国家重点工程,通过工程建设实践和施工技术不断提高,形成了自己的技术特色。
7.In view of the rapid development of electric undertaking and a sharp increase of steel products consumption , the state development planning commission , the former state water resources and hydropower ministry and state energy ministry have been urging that the building of steel towers should be strictly controlled in the construction of transformer substations ; and warning that the need of the present 500kv power transmission and transformer trusses can hardly be satisfied by ordinary steel and concrete electric poles or prestressed concrete poles , which have endangered the operation and longevity of the high voltage transmitting line due to the common problem of cracks by gravity
随着电力工业建设的迅速发展,钢材的用量急剧增长,为此,国家计委,原水电部和能源部一再强调在输变电工程建设中,应从严掌握自立式铁塔的建设。然而,一般的钢筋混凝土电杆或与预应力混凝土电杆,较普遍地存在着纵向裂缝问题,严重影响了高压输电线路的安全运行及其使用寿命,已不能适应高压输电杆塔和变电构架的要求。
Similar Words:
"水电,水力发电" Chinese translation, "水电爆炸效力" Chinese translation, "水电表房" Chinese translation, "水电表房;工作房;机房" Chinese translation, "水电表房;工作房;机房;杂用房" Chinese translation, "水电厂" Chinese translation, "水电成形" Chinese translation, "水电池" Chinese translation, "水电传动装置" Chinese translation, "水电的" Chinese translation