Chinese translation for "水下混凝土"
|
- under water concrete
underwater concrete
- Example Sentences:
| 1. | The technological control of underwater concrete grouting of pile foundation 桩基础水下混凝土灌注的技术控制 | | 2. | Constructing underground concrete impervious wall for facing dam of lianghuei reservoir 梁辉水库面板坝水下混凝土防渗墙施工 | | 3. | Analysis on usual accidents in underwater concrete pouring and its countermeasures 水下混凝土灌注常见事故分析及处理措施探讨 | | 4. | Applying and analyzing on characteristics of placing concrete under water with tremies 直升导管浇筑水下混凝土方法的应用及特点分析 | | 5. | Application of acoustic measuring of concrete quality under water in downstream of yunfeng dam 声波测试在云峰大坝水下混凝土质量检测中的应用 | | 6. | By analyzing the several finished bridge projects , if the hollow pile foundation is adopted , we can economize subaqueous concrete consumption more than 40 per cents ; if the gr outed new technique of pile surroundings and pile toe is adopted , we can increase the load capacity 30 per cents than that of the replacement pile , and economize 20 per cents of the cost . it will show great and obvious economic and social benefits 已建多座桥梁工程采用桩周、桩底压浆新工艺的比较分析表明,该工艺可使水下混凝土的用量节省40以上,且比传统的钻孔灌注桩可提高承载力30以上;节约造价20以上,具有显著的经济效益和社会效益。 | | 7. | Combining theory with practice , in this thesis , i analyses the content of the construction of steel round the barrage . such as , the structure of steel round the barrage , the arrangement of mooring , the calculation of mooring chain , the manufacture and assembling of steel round the barrage , the moving up connection and sinking of it , confining the bottom of underwater concrete 本文结合实际工程,详细分析了钢围堰的构造、锚锭系统的布设、锚缆的计算、钢围堰的制作及组拼、钢围堰的接高与下沉、水下混凝土封底等围堰施工的重要内容;并对常用的钢套箱施工技术进行了讨论。 | | 8. | Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement 文摘:水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。 | | 9. | The cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement 水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。 |
- Similar Words:
- "水下回声测探" Chinese translation, "水下回声地震剖面仪" Chinese translation, "水下回声探测" Chinese translation, "水下回旋" Chinese translation, "水下回转纵倾" Chinese translation, "水下混凝土混合料" Chinese translation, "水下混浊度仪" Chinese translation, "水下火箭" Chinese translation, "水下火警" Chinese translation, "水下火焰切割" Chinese translation
|
|
|