Mobile
Log In Sign Up
Home > english-chinese > "水下混凝土" in Chinese

Chinese translation for "水下混凝土"

under water concrete
underwater concrete
Example Sentences:
1.The technological control of underwater concrete grouting of pile foundation
桩基础水下混凝土灌注的技术控制
2.Constructing underground concrete impervious wall for facing dam of lianghuei reservoir
梁辉水库面板坝水下混凝土防渗墙施工
3.Analysis on usual accidents in underwater concrete pouring and its countermeasures
水下混凝土灌注常见事故分析及处理措施探讨
4.Applying and analyzing on characteristics of placing concrete under water with tremies
直升导管浇筑水下混凝土方法的应用及特点分析
5.Application of acoustic measuring of concrete quality under water in downstream of yunfeng dam
声波测试在云峰大坝水下混凝土质量检测中的应用
6.By analyzing the several finished bridge projects , if the hollow pile foundation is adopted , we can economize subaqueous concrete consumption more than 40 per cents ; if the gr outed new technique of pile surroundings and pile toe is adopted , we can increase the load capacity 30 per cents than that of the replacement pile , and economize 20 per cents of the cost . it will show great and obvious economic and social benefits
已建多座桥梁工程采用桩周、桩底压浆新工艺的比较分析表明,该工艺可使水下混凝土的用量节省40以上,且比传统的钻孔灌注桩可提高承载力30以上;节约造价20以上,具有显著的经济效益和社会效益。
7.Combining theory with practice , in this thesis , i analyses the content of the construction of steel round the barrage . such as , the structure of steel round the barrage , the arrangement of mooring , the calculation of mooring chain , the manufacture and assembling of steel round the barrage , the moving up connection and sinking of it , confining the bottom of underwater concrete
本文结合实际工程,详细分析了钢围堰的构造、锚锭系统的布设、锚缆的计算、钢围堰的制作及组拼、钢围堰的接高与下沉、水下混凝土封底等围堰施工的重要内容;并对常用的钢套箱施工技术进行了讨论。
8.Abstract : the cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
文摘:水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
9.The cause of underwater concrete reinforcing cage up - floating accident is improper operation , such as loose - placement of reinforcing cage , fast - drawing of conduct pipe , improper embedded depth of conduct pipe ; and the poor quality of concrete , for example , the slump , sand percentage , adhesiveness and initial setting time don " t meet requirement
水下混凝土浇注钢筋笼上浮事故的原因是操作不当,如钢筋笼固定不牢、提升导管过猛、导管埋深不当等,以及混凝土品质差,如坍落度、含砂率、粘聚性、初凝时间等不合要求。
Similar Words:
"水下回声测探" Chinese translation, "水下回声地震剖面仪" Chinese translation, "水下回声探测" Chinese translation, "水下回旋" Chinese translation, "水下回转纵倾" Chinese translation, "水下混凝土混合料" Chinese translation, "水下混浊度仪" Chinese translation, "水下火箭" Chinese translation, "水下火警" Chinese translation, "水下火焰切割" Chinese translation