Mobile
Log In Sign Up
Home > english-chinese > "模板工程" in Chinese

Chinese translation for "模板工程"

boxing work
form work engineering
formwork
shuttering work
shutteringwork


Related Translations:
大型模板:  large scale form
模板能量:  template capacity
圆模板:  circle template
圆形模板:  finish machined round plate
临时模板:  temporary form
安装模板:  erect framework
上模板:  cope match plate patterncope match-plate patterncope platemale core platemale plateupper die plateupper mold plateupper plate
拉线模板:  die
模板机理:  template mechanism
模板拉杆:  form tie
Example Sentences:
1.Construction tower scaffold and shelf hoisting and moulding works
四、施工塔架吊装及模板工程
2.Technical code of slipform engineering
滑动模板工程技术规范
3.Firstly this text studied the super thick planceer of mass concrete of high - rise building with ten characteristics comparing with the common reinforced concrete , according to the above characteristic from three aspect including the reinforcing bar project , the concretes project and the form project , elaborate the construction characteristics of super thick mass concrete planceer of high - rise building , have a detailed explanation of the big reinforcing bar link technique and the pump technique of the prepared concrete
首先本文研究了高层建筑超厚底板大体积混凝土的与普通钢筋混凝土相比具有的十个特性,根据上述特性从钢筋工程、模板工程、混凝土工程三个方面阐述了高层建筑超厚底板大体积混凝土的施工特点,重点就钢筋连接技术、预拌混凝土泵送技术进行详细论述。
4.The tower shafts , most of which are hollow and varying in cross section , and altitudinal construction bring trouble to the form work and the stress of strand wire . and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints , elastic deformation , uneven settlement and temperature changes . the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction
但大跨度桥梁混凝土索塔施工设备进场及现场管理都比较困难;塔柱多为空心变截面,且为高空作业,给模板工程及预应力张拉带来一定困难;支撑系统连接的间隙变形、弹性变形、不均匀沉降以及环境温差可导致横梁裂缝;索塔施工偏位会引起的承台和基础的附加应力,对加劲梁的架设影响大;悬吊结构未完体系(架设时)施工阶段的风致振动往往影响到施工的安全和质量;实心塔柱部分体积较大,易产生温度裂缝。
5.Fabrication of the box beam is divided into such parts as reinforcement , formwork , concreting , prestressing , moving and storing of beam , pipe grouting under pressure , end sealing of the beam , water - proof layer on the bridge surface system , protective coating etc . the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects , such technologies as : manufacturing and fixing of reinforcement , steel reinforcement fixing baseplate , web plate and top plate respectively and lifting the steel skeleton into form , requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork , optimization of concrete ratio , concrete pouring process of two ends of beam in priority over the middle , in sequence of first baseplate followed by web plate and top plate at last , concrete pouring in inclined section and in horizontal layer , concrete vibration mainly by external vibrator in assistance with internal vibrator , methods and regulation for steam curing of concrete , dual controls over stress and strain to ensure quality of prestressing workmanship , construction method of effective beam moving by heavy - weight special moving facility , some regulations and key notes about construction of grouting under pressure , beam ends sealing , water - proof layer on the bridge surface system , protective coating
箱梁制造由钢筋工程、模板工程、混凝土工程、预应力工程、移存梁工程、孔道压浆工程、梁体封端工程、桥面防水层和保护层工程等施工环节组成。文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
6.Bing top down construction is carried out , the underground structure construction , including soil engineering , concrete casting and formwork , becomes more complicated and more strict . the paper gives a detailed research on the problems , and brings forward corresponding solutions . the monitor of the deep pit is also the important problem to the top down construction
地下室主体结构也因采用逆作法施工,使土方工程、砼逆作浇筑、模板工程等变得更为复杂,要求也更加严格,本文对地下室主体结构施工中的有关问题进行了较为详细的研究,提出了相应的解决措施。
7.The next this text is based on the appearance theories , according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency , suppose the level shears are line with the displacement , adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model , from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint , and analysis the crack rule and the influence factor of mass concrete temperature contract , and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length , at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience , bringing five technique measures to prevent the temperature crack of mass concrete
其次本文以唯象理论为基础,根据高层建筑超厚底板大体积混凝土承受的温差主要是均匀温差和均匀收缩的特点,阐述了大体积混凝土温度应力理论计算的简化方法和最大整浇长度的计算方法,同时根据大体积混凝土温度收缩应力基本公式和大体积混凝土结构施工经验,提出了防止大体积混凝土温度裂缝的五项技术措施。最后本文以厦门邮电大厦3 . 5m超厚底板施工为实例,从大体积混凝土温度应力计算、混凝土保温材料厚度计算、混凝土配合比的确定,钢筋工程、模板工程、混凝土的泵送和浇筑以及大体积混凝土内部温度的监测和后期养护等方面进行了理论应用。
8.To avoid manual labor of chiseling - grossness , in the area of second - stage concrete construction , permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete . substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars , and safety of construction and stability of quality , and greatly reduce cost . it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction
混凝土缝面处理采用高压水流冲毛技术,大大提高了施工工效,减少了仓面污染;模板工程大量采用定型钢模板施工技术,提高了坝体混凝土成型质量和工程进度;在二期混凝土施工区域,为免除人工凿毛劳动强度,采用永久性免拆金属模板网作为一期混凝土模板;钢筋连接改进传统的电焊连接方式,采用大量采用钢筋接头机械连接技术,有效提高了接头强度和钢筋连接速度,施工安全性大大加强,质量稳定性有效提高,经济成本大大降低;三峡二期工程持续高强度混凝土施工系统工程的研究,使三峡工程成为名符其实的“世界一流工程”成为可能;三峡二期工程混凝土温控综合技术的应用,有效降低了坝体混凝土温度的产生;混凝土表面处理及裂缝处理技术的应用,提高了建筑物的整体性和耐久性。
Similar Words:
"模板费" Chinese translation, "模板覆盖" Chinese translation, "模板复印文件" Chinese translation, "模板工" Chinese translation, "模板工场" Chinese translation, "模板工祝引" Chinese translation, "模板工仔包者" Chinese translation, "模板工祖范" Chinese translation, "模板工作" Chinese translation, "模板构筑" Chinese translation