Mobile
Log In Sign Up
Home > english-chinese > "最大延迟" in Chinese

Chinese translation for "最大延迟"

maximum-delay

Related Translations:
延迟信息:  deferred message
防止延迟:  avoidance of delay
分组延迟:  pd packet delay
延迟滤波器:  delay filterfilter with time delay
延迟回声:  delayed sweep
延迟植入:  delayed implantation
延迟破坏:  delayed fracture
操作延迟:  delay of operationoperating delay
延迟期间:  timing period
预延迟:  predelay
Example Sentences:
1.Accepts the submission , but the caller can control only the maximum delay using the start timeout
执行提交之前,可能会发生延迟,但是调用者只能控制最大延迟(用启动超时) 。
2.This paper presents suffcient conditions of the existence of optimal batch sequences when all jobs form one batch for some batching scheduling models
摘要研究了目标函数为完工时间平方和及最大延迟的分批排序问题存在仅分一批的最优解的充分条件。
3.The server that is running team foundation server should have a reliable network connection with a minimum bandwidth of 1 mbps and a latency maximum of 350ms
运行team foundation server的服务器应具有可靠的网络连接,最小带宽为1 mbps ,最大延迟为350ms 。
4.This thesis contains three parts , the objective is to minimize the maximum lateness on batching machine . two variants are analyzed . in part one , some notion , definitions and basic background information - ts introduced
在实际生产中,存在大量成批加工的问题,即如何分批,以便使某一目标函数达到最优的问题,论文主要研究了目标为极小化最大延迟时间的分批排序问题。
5.Some heuristics for the problems are present , and their performance guarantee is analyzed by the transform lemma . some present results are improved . in part three , the problem of scheduling n jobs on a single ' batching machine is addressed , and the jobs have release times and due dates
第三部分研究了单台批处理机器,工件的到达时间不同,以极小化最大延迟时间为目标的分批排序问题1 | r _ j , b | lmax ,论文提出了一些近似算法,给出该了问题相应的最差性能比界。
6.In the second place , based on the asu of buggenum igcc plant in netherlands , both static and dynamical model for distillation tower of the asu are created and some valuable conclusions are gained as well . finally , a compartmental simplified model is created for distillation tower of the asu , in order to reduce the simulation time and increase the simulation efficiency . the new model will be helpful to the further simulation and on - line optimal control for the asu of the igcc plant
其次,本文以荷兰buggenum电站的空分系统为原型,基于matlab建立了空分系统精馏塔的半图形化动、静态数学模型,并通过模拟,得出了一些有价值的结论:当空分系统的压力变化时,氧气产品浓度的响应时间常数为两小时左右,说明空分系统是igcc电站最大延迟环节;而且虽然氧气浓度最后会稳定在igcc电站所要求的范围之内,但在过渡过程中会超出限制,这些都为igcc电站的安全运行及控制系统设计提供了有价值的信息。
7.Using an 8 - depth async fifo solves the synchronization and exchange of data be - tween different clock domains . the data transaction protocol comes from the most basic work way of uart . when the master clock is 16 . 7mhz , the pcm side and adpcm side clocks both are 2 . 38mhz , the results of simulation show that the latency from the start - bit of pcm data inputting uart receiver to the stop - bit of adpcm data outputted uart transmitter is 14 . 3 us and the latency from the start - bit of adpcm data inputting uart receiver to the stop - bit of pcm data outputted uart transmitter is 14 . 7 us
在主时钟为16 . 7mhz , pcm数据端与adpcm数据端时钟均为2 . 38mhz时,模拟结果表明从pcm的起始位输入uart接收器到adpcm终止位输出uart发送器的最大延迟为14 . 3 s ,从adpcm的起始位输入uart的接收器到pcm终止位输出uart发送器的最大延迟为14 . 7 s ,设计时尽可能的使编码与解码的时间相差不多,从结果看出基本达到这个要求。
8.In this paper , we first consider the rescheduling problem to minimize the maximum lateness under a limit on the disruption constraints when d ( subscript j ) , p ( subscript j ) are compatible ; then we consider rescheduling the problem to minimize the total tardiness under a limit on the disruption constraints when p ( subscript j ) = p or d ( subscript j ) = d
该论文首先研究了当工件加工时间和工期相容时,在错位量限制的条件下最小化最大延迟问题;也研究了当工件加工时间相同或工件工期相同时,在错位量限制的条件下最小化误工和问题。
Similar Words:
"最大牙尖吻合" Chinese translation, "最大牙尖咬合接触" Chinese translation, "最大牙间牙合位" Chinese translation, "最大雅可比数" Chinese translation, "最大延长" Chinese translation, "最大延伸" Chinese translation, "最大延续状态" Chinese translation, "最大掩蔽" Chinese translation, "最大眼孔幅度" Chinese translation, "最大眼球速度" Chinese translation