Chinese translation for "施工后的"
|
- post-construction
Related Translations:
水利工程施工: hydraulic engineering construction 施工队长: spread superintendent 施工准备: mobilizationpreliminary work for construction; preparations forpreparation of constructionpreparations for construction 施工编号: construction number 施工车辆: construction vehicle 施工监测: observation during and after construction 施工规程: construction regulations 铺面施工: pavement construction 施工技术: co truction technologyconstruction techniqueconstruction technologyengineering tchniquesengineering techniquesoperating technique
- Example Sentences:
| 1. | Paints should be allowed to dry in accordance with the manufacture ' s recommendation before over coating 施工后的涂料在覆涂前应经过一定的干燥时间。这一时间由涂料制造商推荐。 | | 2. | The author reviewed the operational experience and the basic technical indexes of the prime coat and slurry seal of a highway , briefly analyzed the common failing after constructing the prime coat and slurry seal , in addition to the key measure to ensure the construction quality 总结了高速公路透层、稀浆封层的施工经验,对透层、稀浆封层的主要技术指标进行了分析,并指出了透层、稀浆封层施工后的质量通病以及确保施工质量所采取的关键措施。 | | 3. | We care about the ideas and preferences of our clients . for us , it would be an important source for the interior design . we would help you to make your dream house come true . by selecting the low pollution materials to reduce the harmful smell after the construction , we would strive to maintain the healthy interior environment 我们在乎业主的想法与美感,对我们而言,您的机能需求是最重要的设计构想来源.我们想帮你完成你的梦想住宅或空间.在室内建材的选择上,我们为业主挑选低污染的室内建材,以避免施工后的刺鼻味道 | | 4. | In order to achieve the optimized tunneling approach , first , tunneling procedures , shift length , horizontal jet grouting length , bench length and space length between c and d part of crd method are optimized ; on the basis of these results , two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved . as results of the optimized scheme , the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure . the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data 为得出适合本段工程的最佳施工路线,利用大型有限元通用软件ansys对开挖顺序、开挖进尺、水平旋喷长度、台阶长度及crd工法施工的c 、 d部相错长度进行了有限元数值模拟和优化分析,并利用这些分析结果,进行了两个施工方案的三维有限元动态施工模拟,得出了较优的施工方案,并利用施工后的地表沉降槽曲线,对sk3 + 355断面处隧道上方的煤气管线的安全性进行了分析,得出了利用此施工方案施工不会造成此处煤气管线破坏的结论。 |
- Similar Words:
- "施工和检修集中荷载" Chinese translation, "施工合同" Chinese translation, "施工合同, 工程建设合同" Chinese translation, "施工合同的特点与构成" Chinese translation, "施工合同条款" Chinese translation, "施工后检查" Chinese translation, "施工后检验" Chinese translation, "施工呼吁" Chinese translation, "施工坏费" Chinese translation, "施工坏和工具" Chinese translation
|
|
|