Mobile
Log In Sign Up
Home > english-chinese > "操作负荷" in Chinese

Chinese translation for "操作负荷"

operating load

Related Translations:
负荷力:  beanspruchung belastungskraft effort
费用负荷:  expense burdenexpense loadingexpenses burden
计算负荷:  calculated load
摆动负荷:  swinging load
单负荷:  single phase load
负荷容量:  load capacityload carrying capacity
负荷率:  burden ratesload factorload rateload-carry dutyloadfactorrate of load condensate
负荷极限:  load limitation
剪切负荷:  shear loading
负荷计算器:  loading calculator
Example Sentences:
1.Estimation of intramuscular load of the upper limb in static postures and repetitive work by surface electromyography
手臂静态姿势和反复性操作负荷的肌电测定分析
2.Safety of earth - moving machinery - specification for rated operating load for crawler and wheel loaders
运土机械的安全性.第2部分:履带式和轮式装载机额定操作负荷规范
3.With the mfc visual - programming technique , we developed friendly user interface for iabs 2000 and minimize the operation burden
充分利用了mfc强大的可视化编程技术,为iabs2000配备了良好的用户界面,使操作简单、快速,将用户的操作负荷降至最低。
4.The orifice plate corrugated packings with high number of theoretical stage , permete . 0 . 3 - 1 . 8mbar pressure drop pertheoretical stage . most economical load range with f factor1 . 5 - 3m skg m3
该填料每米有相当高的理论板数,每块理论板的压降0 . 31 . 8mbar ,最佳操作负荷因子1 . 5m
5.With the experimental data and the built of simi - emperical mathematical model , the mocc ( manufacture operation charge chart ) of subcritical extraction process for the system has been obtained
根据实验数据建立了半经验数学模型,并以此确定出了该体系在亚临界抽提过程的生产操作负荷图。
6.In addition , the hf in the downcomer of ctst plate is 110 ~ 150mm lower than that of fl valve plate . it was showed that making a comparison of two plates , the downcomer of ctst tray can cope with more operation loads with the same size downcomers
这说明相同大小的降液管, ctst塔板上的降液管可处理的操作负荷比浮阀塔板的要大;即若在相同的操作负荷下,在设计降液管时, ctst塔板的降液管尺寸可比浮阀塔板的小。
7.By using steady state simulation , the bottleneck of increasing the effic - iency of separation is identified to be the middle sieve tray section with smaller diameter and smaller tray spacing , and the two renovation schemes without any additional invest - ment on equipment are proposed . 4
利用稳态机理模型模拟实际操作过程,找出了限制提高塔的操作负荷以提高操作分离效果的的瓶颈位置,进而提出和比较了在不增加额外设备投资前提下解决这一瓶颈的两套方案。
Similar Words:
"操作符重载" Chinese translation, "操作符左边须是一指针" Chinese translation, "操作服务周期" Chinese translation, "操作服务状态" Chinese translation, "操作辅助子系统" Chinese translation, "操作改进" Chinese translation, "操作改善" Chinese translation, "操作概率单位,工作概率值" Chinese translation, "操作概念" Chinese translation, "操作概念与脚本" Chinese translation