| 1. | Other control measurements are normally made across the joints or at the base of the principal cantilever to determine the eventual separation movements . 通常沿着各条接缝或主悬臂梁的基底作其它控制测量,以确定最后的分离运动。 |
| 2. | Application of gps in controlling measurement of the enterprises 在企业控制测量中的应用 |
| 3. | The problems discussion about applications of gps to engineering control surveying 在工程控制测量中应注意的几个问题 |
| 4. | Control survey of mining area 矿区控制测量 |
| 5. | Topographic control surveys 图根控制测量 |
| 6. | Horizontal control surveys 平面控制测量 |
| 7. | Cadastral control survey 地籍控制测量 |
| 8. | Vertical control surveys 高程控制测量 |
| 9. | Graphic control survey 图解控制测量 |