| 1. | Research and manufacture of underwater sand pump for engineering construction 工程施工用排沙潜水泵的研究及制造 |
| 2. | Design of flood - releasing energy dissipator and sediment - flushing structure for dachaoshan hydropower station 大朝山水电站泄洪消能及排沙建筑物设计 |
| 3. | The deposition of bed load sediment was greatly reduced in the sump by adding a flushing gallery 通过在集水池底设置排沙廊道,较好地解决了推移质泥沙淤积问题。 |
| 4. | Bottom hole layout of flood discharing and sediment flushing and application of silicon powder concrete in baishi reservoir 白石水库泄洪排沙底孔布置及硅粉混凝土应用 |
| 5. | Static analysis by three - dimensional finite element method for bottom intake of drainage and sediment flushing in baishi reservoir 白石水库泄水排沙底孔三维有限元静力分析 |
| 6. | Improvement of flood and waterlogging disasters by sediment flushing and sedimentation reducting in lower reach of weihe and sanmenxia reservoir area 排沙减淤治理渭河下游三门峡库区洪涝灾害 |
| 7. | The department took part in the study on the renovation of sanmenxia reservoir , this picture shows sediment sluice from the reservoir 图为三门峡水库枢纽正在泄流排沙,泥沙所参加了三门峡水库改建工程的科研工作。 |
| 8. | As for the latter relationship , by fitting in the two phases of time , the function expressions of the sand discharge capacity and tonnage is gained in the end 按时间分为两段进行拟合,最终确定了排沙量与水流量的函数关系。 |
| 9. | It is built in the center of minjiang river , which divide waters of minjiang river into two parts as the inner river and the outer river 建在岷江中心,把岷江水一分为二,分别为内江和外江。内江用于引水灌溉,外江作为泄洪排沙。 |