Mobile
Log In Sign Up
Home > english-chinese > "拉萨河" in Chinese

Chinese translation for "拉萨河"

[ lāsàhé ]
lhasa he

Related Translations:
帕拉萨河:  palasa sungaisungai palasa
萨拉萨河:  salaza riversalaza, r
库拉萨河:  curaca rivercuraca, r
Example Sentences:
1.Built on the bank of lhasa river , the station faces the famous potala palace
火车站建在拉萨河边,对面就是著名的布达拉宫。
2.The monitoring station set up three atmospheric sampling sub - stations , three river water monitoring sub - stations and 27 traffic noise monitoring sub - stations in downtown lhasa and the upper , middle and lower reaches of the lhasa river
监测站在拉萨城区及拉萨河的上、中、下游设立了3个大气采样点、 3个河水监测点和27个交通噪声监测点。
3.About 1 km to the city center ; 5 minutes walking distance from the potala palace ; 8 minutes from the norbu lingka . 100km to airport ; about 1 km to the city center ; 5 minutes walking distance from the potala palace ; 8 minutes from the norbu lingka
-世纪酒店毗邻拉萨河畔,位于德吉路与江苏路交汇处的繁华路段,步行去布达拉宫仅需5分钟路程,去罗布林卡耶只要8分钟的时间,交通十分便利。
4.In a glen a short distance from the left bank of the lhasa river , there is a village called dangdong . moving further on for half an hour , you will come upon a green valley overgrown with all sorts of trees and with a stream running through it
拉萨河左岸不远的一处山沟里,有一个名叫“当东”的村庄,从此地再向山立攀登半小时,在海拔4oo0米的鬲处,会意想不到地发现一片苍翠的山谷。
5.Based on the analysis of problems of previous bridge bearings after installation , for installation of the bearings of lhasa river bridge , the construction method of grouting epoxy resin mortar into anchor bolt holes of a bearing with the aid of potential energy of base plates of the bearing is used
摘要结合分析以往桥梁支座施工后留下的隐患,拉萨河特大桥支座采用锚栓孔灌注环氧树脂砂浆,底板位能压浆的安装方法。
6.Monitoring at the stations in dagze county and lhasa city , both on the upper reaches of the lhasa river , and the estuary of the lhasa and yarlung zangbo rivers reports no changes that have taken place to the acidity and basicity , hardness and chemical oxygen consumption ( coc ) of the water
通过对拉萨河上游达孜县、拉萨市以及拉萨河与雅鲁藏布江的汇合处3个点的监测,水的酸碱度、硬度和化学耗氧量在3个点上均无变化。
7.This paper presents the welding quality control measures and welding methods prepared in accordance with the working time , site conditions and elements of the steel tube arches of lhasa river bridge , and also describes in details the procedure control , methods and criteria for inspection and acceptance of the welding operation
摘要介绍拉萨河特大桥钢管拱焊接质量控制措施,因时因地因件制定焊接方法,强调焊接的过程控制、检验和验收的方法、标准。
8.This paper presents the structural design of the main bridge of lhasa river bridge , makes a deep - going study of the key techniques for design of the bridge , such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure , mechanical behaviour of the dual arch ribs , and section of the continuous girder tie beam , and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge
摘要介绍了拉萨河特大桥主桥结构设计情况,对于五跨梁拱组合桥梁各孔跨合理的跨度比、叠拱的受力行为及连续梁系杆截面形式等设计中的关键性问题进行了深入的研究,给出了主桥连续梁系杆的刚度和应力情况、钢管混凝土拱的应力情况。
9.Also to get some new conclusion of glacial lakes burst floods , in possibility study of glacial lake burst , and in qualitified study of the safety of the glacial lakes . the first character of this paper introduce the background of this paper , set the goal , content and methodlogy of the study work in this paper . the second chapter of this paper focuses on the meterological character , runoff composition character , why not correspondency of ratio of rainfall and runoff in same period to annual value for nianchu river , lasha river , niyang river and the middle reach of yalu - zangbu river
本文第一章介绍了课题的研究背景,提出了研究目标、内容和方法;第二章重点分析了年楚河、拉萨河、尼洋河和雅鲁藏布江干流中游段的气候特征,径流组成特性,同期降水、径流占年总量比例的不对应特性和原因,径流年内年际变化规律及径流深分布特性,分析了天然洪水的特点和洪水参数;第三章介绍了冰川终碛湖的特点,结合已经发生溃决的冰川终碛湖的有关调查资料和考察资料,分析提出了危险冰湖判别指标和发生溃决的气候条件、周期性特征,提出了冰湖溃决洪水的计算途径。
10.For example , a batch of large and medium - sized key projects such as the yamzhog yumco pump storage power station and the norbusa chromite mine in shannan are put under strict supervision and management in accordance with the law on environmental protection ; the garbage dump located close to the lhasa river was moved to another place to minimize water pollution , and polluted water treatment centers were set up
为保护生态环境,环境保护部门采取了一系列措施,如对正在兴建的羊卓雍湖电站、山南罗布萨铬铁矿等一批大中型重点工程,严格依照环境保护法进行监督和管理;搬迁距拉萨河不远的垃圾场,以减轻对拉萨河的污染;建立污水处理场等。
Similar Words:
"拉萨贡嘎机场" Chinese translation, "拉萨狗" Chinese translation, "拉萨古里亚" Chinese translation, "拉萨哈塔" Chinese translation, "拉萨豪" Chinese translation, "拉萨火车站" Chinese translation, "拉萨基" Chinese translation, "拉萨加" Chinese translation, "拉萨假日饭店" Chinese translation, "拉萨角" Chinese translation